2018-09-20 06:40:451) COVER SHEET - DEFINE THE OCCUPANCY OF THE STRUCTURE
 IN ACCORDANCE WITH CHAPTER 3 OF THE 2017
 FBC-BUILDING.THE PLAN NOTES THE OCCUPANCY AS "POR"
 WHICH IS NOT DEFINE IN THE FBC. CLARIFY.
 2) COVER SHEET - A NOTE ON THE LEFT SIDE OF THE COVER
 SHEET REFERS TO THE 2010 FLORIDA BUILDING CODE. REMOVE
 THIS NOTE. THE CODE IN EFFECT IS THE 2017 FBC.
 3) SHT.A1.01 - THE BREAK ROOM SINKS AND COUNTERTOPS
 SHALL COMPLY WITH THE 2017 FBC-ACCESSIBILITY SECS.
 212.3, 606.1 THROUGH 606.5. SHOW THE REQUIRED CLEAR
 FLOOR SPACE FOR THE BREAK ROOM SINKS ON THE PLANS.
 4) INDICATE THE OCCUPANT LOAD OF EACH COMMERCIAL SPACE
 ON THE FIRST FLOOR IN ACCORDANCE WITH THE 2017 FBC
 TABLE 1004.1.2.
 5) THE DOORS IN THE HANDICAP ACCESSIBLE TOILET ROOMS ON
 THE FIRST FLOOR CANNOT SWING INTO THE REQUIRED CLEAR
 FLOOR SPACE FOR THE LAVATORY PER THE 2017 FBC-ACCESS.
 SEC.603.2.3.
 6) THE CONFIGURATION OF THE FIRST FLOOR PLAN ON SHT.
 A1.01 DOES NOT CORRELATE WITH SHT. P1.01. THIS ALSO
 OCCURS ON THE ELECTRICAL SHEET E1.02, AND THE
 MECHANICAL SHEET M0.01.
 7) THE WATER SUPPLY SHUTOFF VALVES FOR THE STACKED
 WASHER/DRYER UNITS THAT ARE LOCATED BEHIND THE UNITS
 SHALL BE PROVIDED WITH ACCESS OR THE VALVES SHALL BE
 RELOCATED TO PROVIDE ACCESS PER THE 2017 FBC-PLUMBING
 SEC.606.3.
 8) SHT. A1.02. - SUBMIT STORM DRAIN PIPING CALCULATIONS
 IN ACCORDANCE WITH THE 2017 FBC-PLUMBING SECS. L106.2,
 1106.3, 1106.4.
 9) SECONDARY ( EMERGENCY) ROOF DRAINS OR SCUPPERS SHALL
 BE PROVIDED FOR THE ROOF PER 2017 FBC-PLUMBING
 SEC.1108.1. SECONDARY ROOF DRAIN SYSTEMS SHALL HAVE THE
 END POINT OF DISCHARGE SEPARATE FROM THE PRIMARY
 SYSTEM. 2017 FBC-PLUMBING SEC. 1108.2.
 10) SHOW THE OCCUPANT LOAD FOR THE ROOF DECK /
 RECREATIONAL ROOM. FBC 107.2.1.
 11) TEMPERED WATER IS REQUIRED TO ALL THE TOILET ROOM
 LAVATORIES TO BE USED BY THE PUBLIC, CUSTOMERS, PATRONS
 AND GUESTS PER THE 2017 FBC-PLUMBING SEC.416.5.
 TEMPERED WATER SHALL BE DELIVERED THROUGH AN APPROVED
 WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE
 1070 OR CSA B125.3.
 12) HOT WATER SHALL BE SUPPLIED TO ALL BREAKROOM SINKS
 ON THE FIRST FLOOR. 2017 FBC-PLUMBING SEC.607.1.
 13) THE HOT WATER RECIRCULATION LINE SHALL BE INSULATED
 IN ITS ENTIRETY PER THE 2017 FBC-PLUMBING SEC. 607.5 &
 2017 FBC-ENERGY SEC.R403.5.3.MINIMUM WALL THICKNESS
 SHALL BE ONE INCH.
 14) THE FIRST FLOOR PLAN ON SHT. P2.01 DOES NOT
 CORRELATE WITH THE FIRST FLOOR PLAN ON SHT. A1.01.
 CLARIFY.
 15) THE FIRST FLOOR WATER RISER ON P3.01 DOES NOT
 CORRELATE WITH THE FIRST FLOOR PLAN ON SHT. A1.01 FOR
 THE TYPE OF PLUMBING FIXTURES AND AMOUNT. CLARIFY.
 16) SHT. P3.02 - THE WASTE AND VENT RISER DIAGRAM FOR
 THE FIRST FLOOR DOES NOT CORRELATE WITH THE THE FIRST
 FLOOR PLAN ON SHT.A1.01 FOR THE TYPE OF PLUMBING
 FIXTURES AND AMOUNT. CLARIFY.
 17.)THE BUILDING APPEARS TO BE OVER THREE STORIES,
 THEREFORE AN ELEVATOR WILL BE REQUIRED PER FL. STATUTE
 399.305 (2).
 18) SUBMIT COMPLETE DETAILS FOR THE ACCESSIBLE TOILET
 ROOMS ON THE FIRST FLOOR.COMPLY WITH 2017
 FBC-ACCESSIBILITY. DETAILS REQUIRED FOR GRAB BARS (
 HEIGHT, LOCATIONS, LENGTHS, ETC.), PLUMBING FIXTURE,
 TOILET PAPER AND HAND TOWEL DISPENSERS, MIRRORS, ETC.
 2017 FBC 107.2.1.
 19) IF AN ELEVATOR IS INSTALLED IN THIS BUILDING THEN
 ALL THE RESIDENTIAL UNITS SHALL COMPLY WITH ALL THE
 REQUIREMENTS OF THE FEDERAL FAIR HOUSING ACT &
 GUIDELINES.
 20) SUBMIT FIRESTOPPING DETAILS FOR THE HORIZONTAL AND
 VERTICAL PIPE PENETRATIONS. SUBMIT MANUFACTURER'S
 INFORMATION, LISTING, INSTALLATION DETAILS, ETC. FBC
 107.2.1.
 21) BACKFLOW PREVENTION DEVICES ARE REQUIRED ON THE
 DOMESTIC WATER SERVICE AND THE FIRE SERVICE LINES. A
 SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW DEVICES. A
 FIRE PROTECTION CONTRACTOR LICENSED AS A CONTRACTOR I,
 II OR V SHALL APPLY FOR THE PERMIT FOR THE FIRE
 BACKFLOW AND A LICENSED PLUMBING CONTRACTOR SHALL APPLY
 FOR DOMESTIC BACKFLOW. PLEASE CONTACT THE CITY OF WPB
 UTILITIES DEPT. AT 561-822-2240 FOR THE TYPE OF DEVICE
 REQUIRED AND LOCATION.
 22) THE FLOOR DRAINS ON THE FOURTH FLOOR ARE NOT
 PROPERLY VENTED. 2017 FBC-PLUMBING SEC.901.2, 901.2.1.
 23) VENTS EXCEEDING 40 FEET IN DEVELOPED LENGTH SHALL
 BE INCREASED BY ONE NOMINAL PIPE SIZE FOR THE ENTIRE
 DEVELOPED LENGTH OF THE VENT PIPE. 2017 FBC-PLUMBING
 SEC.906.2.
 24) SHT. P4.01 - VENT INCREASER DETAIL - NOTE #1 STATES
 "VENT THROUGH ROOF TO BE 4 INCHES." THE SANITARY RISER
 ON SHT. P3.02 SHOWS ALL 2 INCH VENTS. CLARIFY.
 25) SHT.P4.01 - SHOW THE SIZE OF THE EXPANSION TANK.
 26) THE MINIMUM SIZE OF THE PAN DRAIN FOR THE WATER
 HEATER SHALL BE 3/4 INCH. 2017 FBC-PLUMBING SEC.
 504.7.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved