| 2018-07-12 16:39:10 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #18060562 |
| | 7/12/18 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) PROVIDE COOLING AND HEATING CALCULATIONS FOR THE NEW |
| | AC SYSTEMS- SECTION C403.2.1 FBC-17 EC. |
| | |
| | 2) SEPARATE PERMITS ARE REQUIRED FOR THE KITCHEN HOOD |
| | AND FIRE SUPPRESSION SYSTEM, HOWEVER THE PLANS FOR THE |
| | MAIN PERMIT SHALL PROVIDE THE FOLLOWING INFORMATION: |
| | |
| | A) A MEANS OF SUPPLYING MAKEUP AIR DURING THE OPERATION |
| | OF THE HOOD EXHAUST SYSTEM- SECTION 508.1 FBC M. |
| | CONCERNING THE SEQUENCE OF OPERATIONS NOTE ON SHEET |
| | M2.1, THE WINDOWS CANNOT BE USED AS MAKEUP AIR OPENINGS |
| | BECAUSE THEY ARE NOT CONSIDERED GRAVITY OPENINGS. |
| | |
| | B) EQUIPMENT SCHEDULES FOR THE HOOD, EXHAUST FAN, AND |
| | MAKEUP AIR UNIT. |
| | |
| | C) LOCATIONS OF THE FANS AND REQUIRED CLEARANCE |
| | DISTANCES- SECTIONS 401.4 AND 506.3.13 FBC M. |
| | |
| | D) AN AIR BALANCE SCHEDULE OR DIAGRAM INDICATING THE |
| | DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR |
| | BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR |
| | FOR THE FACILITY, PLUS THE NET EXFILTRATION IF |
| | APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE |
| | SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET |
| | EXFILTRATION- SECTION 508.1.1 |
| | |
| | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR ALL |
| | GAS-FIRED COOKING APPLIANCES- SECTION 623.1 FBC FG. |
| | |
| | 4) INDICATE HOW COMBUSTION AIR WILL BE PROVIDED TO THE |
| | COOKING APPLIANCES AND PROVIDE CALCULATIONS- SECTION |
| | 304 FBC FG. PLEASE NOTE THAT THERE IS NO KITCHEN |
| | EQUIPMENT SCHEDULE ON SHEET A1.11. |
| | |
| | 5) INDICATE HOW THE DRY STORAGE ROOM WILL BE VENTILATED |
| | AND PROVIDE A CALCULATION- SECTION 401.2. |
| | |
| | 6) SHEET M2.1 & M6.1: A SPACE HEATING SYSTEM SHALL BE |
| | PROVIDED TO THE KITCHEN IN COMPLIANCE WITH SECTION |
| | 309.1 FBC M. THE AC EQUIPMENT SCHEDULE INDICATES NO |
| | HEAT FOR THE AHU'S. |
| | |
| | 7) M2.1: CLARIFY HOW THE AC SYSTEMS WILL ONLY RUN AFTER |
| | HOURS ONLY WHEN THE PLAN SHOWS THEY ARE BEING |
| | CONTROLLED THERMOSTATICALLY. PLEASE SEE SECTION |
| | C403.2.4- C403.2.4.2.3 FBC EC. |
| | |
| | 8) M6.1: THE GH-1 (COOK 16X16 GI) IS A GRAVITY |
| | VENTILATOR, HOWEVER IT IS INCLUDED IN THE EXHAUST FAN |
| | SCHEDULE WITH AN EXHAUST RATE OF 750 CFMS. |
| | |
| | 9) SUBMIT FL. PRODUCT APPROVALS OR MIAMI-DADE NOA'S FOR |
| | THE AC STANDS, AND THE ROOF MOUNTED EXHAUST FANS. |
| | PROVIDE SITE SPECIFIC ENGINEERING FOR UNIT ANCHORING |
| | AND ATTACHMENTS TO THE ROOF STRUCTURE- SECTION 301.15 |
| | FBC M. |
| | |
| | 10) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE AIR |
| | HANDLERS- SECTION 307.2 FBC M. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |