| Plan Review Notes For Permit 18060557 |
| Permit Number |
18060557 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2018-07-24 10:57:04 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS ON THE HEAT | | | PUMP. WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST. | | | 2) THE HEAT PUMP SHALL COMPLY WITH 2017 FBC- ENERGY | | | SEC. R 403.10.5.2ND REQUEST. | | | 3) SUBMIT TWO COPIES OF AN ENLARGED POOL PUMP CURVE. | | | THE PRINTING IS ILLEGIBLE ON THE ONE ON THE PLANS. | | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | | CALCULATIONS.2ND REQUEST. | | | 4) THE SUBMITTED TDH CALCULATIONS DO NOT APPEAR TO SHOW | | | THE FRICTION LOSS THROUGH ALL THE SYSTEM CCOMPONENTS. | | | THE CALCULATOR SHOWS THE PIPE, FITTINGS, VALVES, | | | HEATER, FILTER, ETC. BUT THERE IS NO FRICTION LOSS | | | ASSOCIATED WITH THESE ITEMS.CLARIFY. PLEASE IDENTIFY | | | THE SOURCE OF THE TDH CALCULATOR FOR VERIFICATION OF | | | THE TDH. | | | 5) SHT. 4 OF 4 - GENERAL NOTES SHEET - VARIOUS NOTES | | | REFER TO APSP 7 - 2006 EDITION. THE 2017 FBC REFERENCES | | | THE 2013 EDITION. REVISE ALL NOTES TO REFLECT THE 2013 | | | EDITION. 2ND REQUEST. | | | 6) VOID OUT OLD PLANS. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|