| 2019-01-22 15:15:59 | FLORIDA BUILDING CODE 2017 6TH EDITION |
| | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED |
| | NFPA 70 2014 EDITION |
| | |
| | JAKE LEAHY |
| | ELECTRICAL PLANS EXAMINER II |
| | 561-805-6713 |
| | [email protected] |
| | |
| | |
| | PLANS INDICATE LOW VOLTAGE AND HIGH VOLTAGE TWO |
| | SEPARATE PERMIT WILL BE REQUIRED COMPLETED |
| | |
| | FIRE ALARM AND ACCESS CONTROL SHOULD BE DONE ON |
| | SEPARATE PLANS AND SEPARATE PERMITS. COMPLETED |
| | |
| | NEED CUT SHEETS FOR ALL CAMERAS, MOTION SENSORS, KEY |
| | PADS, CARD READERS, CABLES, ECT, ECT NOT COMPLETED |
| | |
| | PANEL SCHEDULES NEED TO IDENTIFY CIRCUITS NOT JUST AS |
| | EXISTING. COMPLETED |
| | |
| | ALL EQUIPMENT SHALL BE LISTED AND USED IN ACCORDANCE |
| | WITH THE MANUFACTURERS INSTALLATION INSTRUCTIONS. NOT |
| | COMPLETED NEED CUT SHEETS TO CONFIRM |
| | |
| | 110.3 EXAMINATION, IDENTIFICATION, INSTALLATION, AND |
| | USE OF EQUIPMENT |
| | ( B) INSTALLATION AND USE. LISTED OR LABELED EQUIPMENT |
| | SHALL BE INSTALLED AND USED IN ACCORDANCE WITH ANY |
| | INSTRUCTIONS INCLUDED |
| | IN THE LISTING OR LABELING. NOT COMPLETED |
| | |
| | CHANGING OUT COMPONENTS OF DIFFERENT SYSTEMS SHALL BE |
| | LISTED IN ACCORDANCE WITH THE MANUFACTURERS |
| | SPECIFICATIONS. NOT COMPLETE NEED LISTINGS TO CONFIRM |
| | |
| | VALUE OF THE WORK SEEMS LOW THERE IS A SIGNIFICANT |
| | AMOUNT OF WORK SHOWN ON THESE PLANS. COMPLETED |
| | |
| | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL |