| Plan Review Notes For Permit 18060242 |
| Permit Number |
18060242 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2018-07-25 05:57:40 | 1) THE SUBMITTED TDH CALCULATIONS DO NOT APPEAR TO SHOW | | | THE FRICTION LOSS THROUGH ALL THE SYSTEM CCOMPONENTS. | | | THE CALCULATOR SHOWS THE PIPE, FITTINGS, VALVES, | | | HEATER, FILTER, ETC. BUT THERE IS NO FRICTION LOSS | | | ASSOCIATED WITH THESE ITEMS.CLARIFY. | | | 2) INDICATE ON THE PUMP CURVE WHICH KEY CURVE IS FOR | | | THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 3) SUBMIT TWO COPIES OF AN ENLARGED POOL PUMP CURVE. | | | THE PRINTING IS ILLEGIBLE ON THE ONE ON THE PLANS. | | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | | CALCULATIONS.2ND REQUEST. | | | |
|