| 2018-07-03 15:20:45 | 1ST REVIEW: FBC 2017 6TH ED. RESIDENTIAL | | | 1ST REVIEW FBC 2017 EXISTING BUILDING | | | | | | THE CONTRACTOR HAS ELECTED TO DEFER THE SUBMITTAL OF | | | THE MECHANICAL DESIGN HOWEVER AN ENERGY SUBMITTAL IS | | | REQUIRED PER THE BUILDING PLAN REVIEW COMMENTS AND AN | | | EQUIPMENT SIZING SUBMITTAL PER R403.7HEATING AND | | | COOLING EQUIPMENT (MANDATORY) WILL BE REQUIRED.. | | | | | | STEVEN KENNEDY, CBO | | | ASSISTANT BUILDING OFFICIAL | | | (561) 805-6710 | | | [email protected] | | | |
|