| Date |
Text |
| 2018-08-16 08:55:36 | ****CORRECTIONS**** |
| | W.P.B. PERMIT: 18051464 |
| | REVIEWED: AUGUST 15, 2018 |
| | |
| | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6718 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | 1. SOME OF THE UPLOADED DRAWINGS NAMING DESIGNATIONS |
| | DON?T MATCH THE SHEET PROVIDED. PLEASE RE-UPLOAD THE |
| | FOLLOWING ARCHITECTURAL DRAWINGS TO PROJECT DOX. |
| | A.01, A.02, A.03, A.04, A3.3, A3.4, A5.6 AND A5.7 |
| | |
| | 2. ALL CIVIL DRAWINGS WERE UPLOADED STARTING WITH THE |
| | SAME THREE DIGIT DESIGNATION AS ARCHITECTURAL DWG?S. |
| | THIS HAS CAUSED THE ARCHITECTURALS AND CIVIL PLANS TO |
| | GET MIXED IN TOGETHER. |
| | THE THREE DIGIT PREFIX SHOULD START AT 001 AND 001 |
| | SHOULD NOT BE REPEATED. |
| | CIVIL PLANS SHOULD HAVE BEEN 001-021 |
| | ARCHITECTURAL WOULD START AT 022 |
| | TO FIX THIS WITHOUT RELOADING ALL PLANS PLEASE DELETE |
| | ALL CIVIL FILES (C1 THRU C21)RELOAD ALL CIVIL PLANS |
| | WITH THE FIRST THREE DIGIT AS 000. THIS WILL PUT THEM |
| | ALL AT THE TOP OF LIST, AND THE REST OF THE DRAWINGS |
| | WILL KEEP CURRENT DESIGNATIONS. |
| | |
| | 3. SHEET C21 REFERENCES 2014 CODE FOR WIND LOADS. |
| | PLEASE UPDATE TO FBC 2017 6 TH EDITION WHEN SUBMITTING |
| | FOR SITE LIGHTING PERMIT. |
| | |
| | 4. [FBC 107.2.5]PLEASE UPLOAD THE SURVEY TO SUPPORTING |
| | DOCUMENTS. |
| | |
| | 5. A UNITY OF TITLE WILL BE NEEDED TO COMBINE THE TWO |
| | LOTS TOGETHER. CURRENTLY THERE ARE TWO PCN'S AND TWO |
| | ADDRESSES |
| | |
| | 6. DEMO PERMIT FOR FUEL TANKS NEEDS TO BE CLOSED OUT |
| | PRIOR TO PERMIT ISSUANCE. |
| | |
| | 7. THE STRUCTURAL REPORT IS A MULTI PAGE DOCUMENT. THE |
| | FIRST 55 PAGES ARE GOOD, BUT THE REMAINING 35 PAGES |
| | DON?T SHOW UP. PLEASE VERIFY THAT ALL 80 PAGES ARE |
| | PRESENT IN THE DOCUMENT AND RE-UPLOAD TO PROJECT DOX IF |
| | NEEDED. |
| | |
| | 8. THE GEOTECHNICAL REPORT SITE PREPARATION MENTIONS |
| | THE REMOVAL OF TANKS. DOES THE REPORT STATE HOW TO |
| | HANDLE THE INFILL FROM SUCH A LARGE EXCAVATION? THIS |
| | OCCURS UNDER THE BUILDING SITE AND THE REPORT SHOULD |
| | ADDRESS HOW TO ACHIEVE THE 3000PSF REQUIRED. |
| | |
| | 9 SEPARATE PERMITS WILL BE REQUIRED FOR SEPARATE |
| | STRUCTURES. |
| | DRIVE THRU CANOPY, DUMPSTER ENCLOSURE, FENCE(IF |
| | APPLICABLE), LANDSCAPING, SITE LIGHTING(PROVIDE POLE |
| | WIND CALCS) AND ENGINEERING TO PERMIT CIVIL WORK. |
| | |
| | 10. SHEET A1.1 DETAIL CALL OUTS 2/A7.4 AND 3/A74 APPEAR |
| | TO BE FOR SIDE SUPPORT OF THE COILING DOOR, BUT THEY |
| | LEAD TO DETAIL OF SCALA SIGNAGE. |
| | UPDATE DETQAIL CALLOUTS AND PROVIDE DETAIL THEY WERE |
| | INTENDED TO SHOW. |
| | IS ANY ADDITIONAL SUPPORT NEEDED FOR THE DOOR AND MOTOR |
| | SUPPORTED ABOVE, IF SO PLEASE UPDATE STRUCTURAL TO |
| | INCORPORATE. |
| | |
| | 11. SHEET S0.1 DESIGN AND LOADING. UPDATE THE CODE |
| | REFERENCE TO FBC 2017 6 TH EDITION. |
| | |
| | 12. SHEET S.02 IN WIND DESIGN DATA ? UPDATE THE CODE |
| | REFERENCE TO FBC 2017 6 TH EDITION. |
| | |
| | 13. PROVIDE ROOF DECKING ATTACHMENT/SPACING SCHEDULES |
| | FOR THE FLAT ROOF AND THE TOWER ROOF IN APPLICABLE |
| | ZONES FROM S0.2 WIND DATA SHEET. SECTIONS AND DETAILS |
| | SHOW SHEATHING DIFFERENTLY. UPDATE TO SHOW SHEATHING AS |
| | INTENDED. |
| | |
| | 14. ROOF SUB PERMIT WILL BE REQUIRED(SEE ROOFING REVIEW |
| | FOR COMMENTS) |
| | |
| | 15. [FBC 107.3.4.1]SUBMIT TRUSS SHOP DRAWINGS, OR |
| | INDICATE THAT THE SUBMITTAL WILL BE DEFERRED. DEFERRED |
| | SUBMITTALS TO BE REVIEWED PRIOR TO INSTALLATION. |
| | KAWNEER DOORS DON?T PROVIDE FOR WATER INFILTRATION. |
| | PLEASE PROVIDE REQUIREMENTS SET FORTH WATER |
| | INFILTRATION. |
| | [FBC 1710.5.1.1]EXTERIOR WINDOWS AND DOORS (HABITAL |
| | SPACES). (EXCEPTION) 2. DOOR ASSEMBLIES INSTALLED WHERE |
| | THE OVERHANG (OH) RATIO IS EQUAL TO OR MORE THAN 1 NEED |
| | NOT BE TESTED FOR WATER INFILTRATION. THE OVERHANG |
| | RATIO SHALL BE CALCULATED BY THE FOLLOWING EQUATION: |
| | OH RATIO = OH LENGTH/OH HEIGHT |
| | WHERE: |
| | OH LENGTH = THE HORIZONTAL MEASURE OF HOW FAR AN |
| | OVERHANG OVER A DOOR PROJECTS OUT FROM DOOR SURFACE. |
| | OH HEIGHT = THE VERTICAL MEASURE OF THE DISTANCE FROM |
| | THE DOOR SILL TO THE BOTTOM OF THE OVERHANG OVER A |
| | DOOR. |
| | |
| | 16. PROVIDE ROOF DRAINAGE CALCULATIONS, OR IN RESPONSE |
| | LET ME KNOW WHERE THEY ARE. |
| | |
| | NOTE: |
| | -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW |
| | EACH COMMENT IS BEING ADDRESSED. |
| | -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW |
| | OF MATERIALS REQUESTED. |
| | -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS |
| | OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| | SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| | DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| | SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| | OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| | APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| | NEED "VOID", RENDERING THEM NOT USABLE. |
| | |
| | |