| Date |
Text |
| 2018-06-02 04:49:02 | 1) ) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| | SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| | 2) THE GAS PLAN SHOWS A LESS THAN 2 PSI SYSTEM SO WHY |
| | IS THERE A REGULATOR AT THE GENERATOR? CLARIFY. |
| | 3) SHOW THE TYPE OF PIPE AND PIPE SIZE AT THE OUTLET OF |
| | THE GAS METER. |
| | 4) SUBMIT THE MANUF. SPECIFICATIONS FOR THE GAS FLEX |
| | CONNECTOR FOR THE GENERATOR.THE FLEX CONNECTOR SHALL BE |
| | APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE |
| | GENERATOR. 2017 FBCR SEC. G2422.1 (8). |
| | 5) THE TRACER WIRE OR TAPE SHALL NOT BE IN DIRECT |
| | CONTACT WITH |
| | THE POLYAMIDE OR POLYETHYLENE PIPE PER NFPA-15 |
| | SEC.6.9.4.6. |
| | 6) SEDIMENT TRAP IS REQUIRED PER 2017 FBC - FUEL GAS |
| | SEC. 408.4. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | |
| | |