| 2018-05-23 07:51:47 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA |
| | BUILDING CODE 2017 6TH ED. |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| | 6TH EDITION |
| | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION |
| | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE |
| | FS = FLORIDA STATUTES |
| | |
| | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | 1. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS, |
| | DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD |
| | SYSTEMS, WALK IN COOLERS, SIGNS, SITE LIGHTING, AND |
| | SWIMMING POOLS (WHERE APPLICABLE) ARE NOT INCLUDED IN |
| | THE SCOPE OF THIS PLAN REVIEW. PROVIDE A BLOCK NOTE |
| | INDICATING THE REQUIRED SEPARATE PERMITS AND PLAN |
| | SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC |
| | 105.1, 107.2.1 |
| | 2. IT APPEARS THE SERVICE TO THE BUILDING IS 3 PHASE, |
| | 120/208 VOLT. THE RISER DIAGRAM IS SHOWING THE PANEL TO |
| | THE UNIT AS SINGLE PHASE 120/208. IF IT IS A SINGLE |
| | PHASE SERVICE, THE LOAD CALCULATION PROVIDED EXCEEDS |
| | THE VALUE OF THE DISCONNECT, TRANSFER SWITCH, FEEDER |
| | AND POSSIBLY THE METER. ADDITIONALLY, THE FACTOR FOR |
| | CONTINUOUS LOAD IS NOT INCLUDED. PROVIDE CORRECTION AND |
| | ACCURATE LOAD CALCULATION. NEC 220 |
| | 3. PROVIDE SPEC SHEET FOR TRANSFER SWTICH. NEC 110.3; |
| | WPB FBC 107.2.1 |
| | 4. IT APPEARS THAT THE GENERATOR WILL BE OVERLOADED. I |
| | HAVE NOT BEEN ABLE TO FIND A MANUFACTURER THAT MAKES A |
| | SINGLE PHASE 120/208 GENERATOR. WILL A THREE PHASE |
| | GENERATOR WILL BE USED AS A SINGLE PHASE SOURCE? A |
| | THREE PHASE GENERATOR WOULD HAVE AN OUTPUT OF |
| | APPROXIMATELY 61 AMPS. A SINGLE PHASE GENERATOR HAS A |
| | VOLTAGE OF 120/240, WHICH WOULD NOT BE COMPATIBLE WITH |
| | THIS SYSTEM. PROVIDE CLARIFICATION AND GENERATOR SPEC |
| | SHEETS. NEC 110.3, 110.4; WPB FBC 107.2.1 |
| | 5. PROVIDE CLARIFICATION FOR CIRCUITS 9A, 9B, 11A, AND |
| | 11B. WHAT TYPE OF EQUIPMENT IS PLUGGING INTO THESE |
| | DEDICATED OUTLETS? PANEL SCHEDULE SHOWS A LOAD OF .4KW. |
| | PROVIDE SPEC SHEETS FOR THIS EQUIPMENT. NEC 110.3; WPB |
| | FBC 107.2.1 |
| | 6. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH |
| | PANEL INCLUDING INFORMATION FROM THE POWER COMPANY |
| | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR |
| | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE |
| | SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE. |
| | NEC 110.9, 110.10 |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | |
| | SINCERELY, |
| | |
| | JOHN PEARSON |
| | ELECTRICAL PLANS EXAMINER |
| | 561-805-6746 |
| | [email protected] |
| | |