| Plan Review Notes For Permit 18050501 |
| Permit Number |
18050501 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-05-19 05:15:52 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS PER 2013 | | | APSP-7 SEC. 4.4.9.THE TDH CALCULATIONS SHALL BE THE | | | TOTAL FRICTION LOSS OF ALL SYSTEM COMPONENTS EXCEPT THE | | | PUMP. THE MAXIMUM FLOW OF THE PUMP FROM THE PUMP CURVE | | | CAN NO LONGER BE USED TO DETEREMINE MAXIMUM SYSTEM FLOW | | | RATE. | | | 2) WHY HAS A SURVEY FOR LOT 30 BEEN SUBMITTED? CLARIFY. | | | 3) SHT. 2 OF 2 - GENERAL NOTES - PLEASE REVISE NOTE #8 | | | - THE 2013 EDITION OF APSP 7 IS IN EFFECT, NOT 2006. | | | THIS ALSO OCCURS IN NOTE #16. | | | 4) GENERAL NOTE #15 REFERS TO THE 2014 FBC.REVISE TO | | | 2017 FBC. | | | 5) AN REDUCED PRESSURE ZONE BACKFLOW DEVICE IS REQUIRED | | | AT THE WATER METER AND A PRESSURE VACUUM BREAKER | | | BACKFLOW DEVICE IS REQUIRED ON THE AUTOFILL PER CITY OF | | | WPB CROSS CONNECTION CONTROL MANUAL & FBC-PLUMBING | | | SEC.608 & TABLE 608.1. | | | 6) THE VACUUM LINE SHALL BE EQUIPPED WITH A VALVE TO | | | REMAIN IN THE CLOSED POSITION WHEN NOT IN USE. APSP 7 | | | SEC.4.6. | | | 7) | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | |
|