| Plan Review Notes For Permit 18050329 |
| Permit Number |
18050329 |
|
| Review Stop |
FIRE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-05-15 14:38:12 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) THE INSTALLATION SHALL BE TESTED PER NFPA 20, | | | CHAPTER 14 ACCEPTANCE TESTING, PERFORMANCE, AND | | | MAINTENANCE AND PER NFPA 101, CHAPTER 9, BUILDING | | | SERVICE AND FIRE PROTECTION | | | EQUIPMENT | | | | | | | | | PLEASE ENSURE THAT A FIRE INSPECTOR IS PRESENT WHEN | | | ACCEPTANCE TESTING IS SCHEDULED. | | | | | | | | | 2) IF THE INSTALLATION TAKES MORE THAN 4 HRS A FIRE | | | WATCH SHALL BE INITIATED. | | | | | | PER NFPA 1, CHAPTER 13, FIRE PROTECTION SYSTEMS | | | | | | 13.1.9 WHEN A FIRE PROTECTION SYSTEM IS OUT OF SERVICE | | | FOR MORE THAN 4 | | | HOURS IN A 24-HOUR PERIOD, THE AHJ SHALL BE PERMITTED | | | TO REQUIRE THE | | | BUILDING TO BE EVACUATED OR AN APPROVED FIRE WATCH TO | | | BE PROVIDED FOR | | | ALL PORTIONS LEFT UNPROTECTED BY THE FIRE PROTECTION | | | SYSTEM SHUTDOWN | | | UNTIL THE FIRE PROTECTION SYSTEM HAS BEEN RETURNED TO | | | SERVICE. | | | | | | PLEASE NOTIFY THE OCCUPANCY AND THE FIRE MARSHAL IF | | | NEEDED. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | |
|