| 2018-06-04 05:05:17 | 1) SHOW THE DISTANCE FROM THE EXISTING GAS METER TO THE | | | MOST REMOTE GAS OUTLET ON THE SYSTEM. THE EXISTING GAS | | | DRAWING ON FILE IN CITY RECORDS SHOWS THE FURTHEST | | | DISTANCE AS 67 FT. THIS IS THE DISTANCE THAT IS TO BE | | | USE FOR THE SIZING OF THIS SYTEM.2017 FBC-FUEL GAS | | | SEC.402.4.1. | | | 2) THE MINIMUM SIZE OF THE SCH. 40 METALLIC PIPE AT THE | | | METER OUTLET SHALL BE 2 INCHES BASED ON THE TOTAL BTU | | | LOAD AND THE EXISTING DISTANCE OF THE MOST REMOTE GAS | | | OUTLET ON THIS SYSTEM. 2017 FBC-FUEL GAS SEC. 402.4.1, | | | 401.3, 401. | | | 3) THE EXISTING GAS PLAN ON FILE IN CITY RECORDS FOR | | | THIS ADDRESS SHOWS THE SIZE OF THE PIPE ENTERING THE | | | STRUCTURE AS 1 INCH AND YOUR PLAN SHOWSS 3/4 INCH. | | | CLARIFY. | | | 4) THE SUBMITTED GAS PLAN NOTES A 3/4 INCH LINE | | | SUPPLYING AN EXISTING 1 1/4 INCH PE LINE TO THE POOL | | | HEATER AND A NEW 1 1/4 SCH. 40 METALLIC LINE FOR THE | | | GENERATOR. SUBMIT CALCULATIONS/DOCUMENTATION AS TO HOW | | | YOU ARE GOING TO ACCOMPLISH THIS FEAT. WPBAMEND. TO FBC | | | SEC. 107.2.1, 2017 FBC-FUEL GAS SEC.401.8, 402.2 | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | | | | |
|