| 2018-05-13 14:07:16 | 1) SUBMIT MANUF. SPECIFICATIONS FOR THE POOL HEATER. | | | THE POOL HEATER SHALL COMPLY WITH 2017 FBC-ENERGY CODE | | | SEC. R403.5.6.2 & TABLE C404.2.SHT. 5 - ANSI/APSP/ICC | | | 15 NOTES SEC.4.3.2. - THE 2017 FBC-ENERGY REQUIRES A | | | MINIMUM OF 82% MINIMU EFFICIENCY FOR GAS AND OIL FIRED | | | POOL HEATERS BUT THE NOTE STATES 78%. CLARIFY. | | | 2) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS AS REQUIRED | | | BY APSP-7 2013 SEC. 4.4.9, 4.4.9.1..THE MAXIMUM FLOW OF | | | THE PUMP FROM ITS PUMP CURVE IS NO LONGER ALLOWED TO BE | | | USED IN DETERMINING MAXIMUM SYSTEM FLOW RATE. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|