Text |
| 2018-06-03 13:55:33 | 1) THE EXISTING GAS PLANS ON FILE AT THE CITY SHOW A | | | SUMMER KITCHEN WITH A 55,000 BTU LOAD BUT THIS IS NOT | | | SHOWN ON THE SUBMITTED GAS DRAWING. REVISE THE GAS | | | DRAWING TO REFLECT THE SUMMER KITCHEN AND REVISE THE | | | TOTAL BTU LOAD ON THE GAS DOCUMENTS. WPB AMEND. TO FBC | | | SEC. 107.2.1, 2017 FBC-FUEL GAS SEC.401.3, 401.4. | | | 2) THE SHUTOFF VALVE ON THE 3/4 INCH EXISTING LINE INTO | | | THE STRUCTURE SHALL BE LOCATED IMMEDIATELY AHEAD OF THE | | | REGULATOR. 2017 FBC-FUEL GAS SEC.409.4. | | | 3) SHOW THE DISTANCE FROM THE MP REGULATOR FOR THE | | | EXISTING LINE INTO THE STRUCTURE TO THE MOST REMOTE GAS | | | OUTLET ON THAT SECTION. THIS DISTANCE WILL DETERMINE | | | THE PIPE SIZING.THE EXISTING PLANS ON FILE SHOW THE | | | LONGEST RUN AS 100 FEET. | | | 4) THE EXISTING PLANS ON FILE AT THE CITY SHOW THE PIPE | | | SIZE AT THE METER OUTLET AS 1 INCH AND THE SUBMITTED | | | PLAN SHOWS 3/4 INCH. CLARIFY. | | | 5) SHOW THE PIPE SIZE OF THE PE ON THE GAS PLAN. WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | 6) SHOW THE DISTANCE FROM THE METER TO THE REGULATOR | | | FOR THE EXISTING LINE INTO THE STRUCTURE. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | |
|