| Date |
Text |
| 2018-05-08 08:16:40 | 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS NOTE - A |
| | COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME AND |
| | ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED UPON |
| | THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE PVC PIPE 4" IS SHOWN (A-3) IN THE PLUMBING |
| | ISOMETRIC AND THE FIXTURE DRAIN WILL ALLOW THE PIPE TO |
| | BE 3" BECAUSE OF WALL AND SPACE YOU MAY CONSIDER TO |
| | CHANGE THEM ACCORDING TO WHAT CODE ALLOWS. UP STAIN ON |
| | MAIN BUILDING YOU HAVE A WASHING MACHINE THAT SHOWS IT |
| | WITH AN AIR ADMITTANCE VALVE AS PER MANUFACTURES |
| | SPECIFICATION, IT REQUIRES A 3" SIZE PIPE ON AN AAV AND |
| | IT IS RECOMMENDED BY MOST WASHING MACHINES MANUFACTURE |
| | BECAUSE OF SOAP SUDS. |
| | |
| | 2. ROMAN TUB STANDALONE REQUIRED A CONTROL VALVE BY A |
| | WATER TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3, EXCEPT WHERE SUCH PROTECTION IS |
| | OTHERWISE PROVIDED BY A COMBINATION TUB/SHOWER VALVE IN |
| | ACCORDANCE WITH SECTION P2708.4. FBC R 2713.3 BATHTUB |
| | AND WHIRLPOOL BATHTUB VALVES. PLEASE SHOW LOCATION OR |
| | NOTE ON THE PLAN. |
| | |
| | 3. ON SECOND BUILDING SHOW AN OUTSIDE SHOWER PLEASE |
| | LABEL AND GIVE IT MORE DETAILS. IS THERE HOT WATER |
| | COMING FROM THE MAIN HOUSE OR DOES THIS BUILDING HAS |
| | ITS OWN WATER HEATER. IF COMING UNDERGROUND TO FEED HOT |
| | WATER FROM THE MAIN HEATING SOURCE IT MUST BE INSULATED |
| | WITH AN R-3 PER FBC RE 403.5.3 |
| | |
| | 4. PLUMBING WATER RISER DIAGRAM REQUIRED WPB AMENDMENTS |
| | TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL PLUMBING |
| | |
| | 5. THE LOFT HAS A NOTE FOR FUTURE PLUMBING ON THE |
| | SECOND FLOOR AND THERE IS A BATHROOM DOWN STAIR ON THE |
| | FIRST FLOOR EACH BUILDING SHALL HAVE ITS OWN VENT |
| | SYSTEM THOROUGH ROOF AND AN AIR ADMITTANCE VALVE WILL |
| | NOT BE TO CODE. OPTION ONE IS TO VENT THE DOWNSTAIRS |
| | BATH THROUGH THE ROOF AND LATER THE OTHER BATHROOM MAY |
| | BE INSTALLED OR PLUMB THE 2ND-FLOOR BATHROOM SO THE |
| | SYSTEM IS ALL DONE AT THAT POINT. THE VENT SYSTEM |
| | SERVING EACH BUILDING DRAIN SHALL HAVE NOT LESS THAN |
| | ONE VENT PIPE THAT EXTENDS TO THE OUTDOORS. 2017 FBC R |
| | 3102.1 REQUIRED VENT EXTENSION. |
| | |
| | 6. GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN |
| | THIS SUBMITTAL PACKAGE AT THIS TIME. A GAS PLAN REVIEW |
| | HAS NOT BEEN PERFORMED AT THIS TIME. A SEPARATE GAS |
| | PERMIT AND PLANS WILL BE REQUIRED FOR A CONTRACTOR TO |
| | PERFORM THE RELATED WORK. PROVIDE COMPLETE PLANS AND |
| | GAS RISER THAT REFLECTS THE ENTIRE SCOPE OF GAS WORK TO |
| | BE DONE. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | [email protected] |
| | 561-805-6720 |
| | |