| Plan Review Notes For Permit 18041054 |
| Permit Number |
18041054 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-04-30 13:50:40 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS AS REQUIRED | | | BY ANSI/APSP/ ICC-7 2013 SEC. 4.4.9, 4.4.9.1. THE | | | MAXIMUM FLOW OF THE PUMP FROM THE PUMP CURVE IS NO | | | LONGER PERMITTED TO BE USED.THE FLOW RATE SHALL BE | | | DETERMINED BY USING COMPLETE SYSTEM TDH CALCULATIONS | | | AND THEN LOOKING UP THE FLOW RATE USING THE | | | MANUFACTURER'S CERTIFIED PUMP CURVE. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|