| Plan Review Notes For Permit 18040871 |
| Permit Number |
18040871 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2018-06-25 13:48:23 | 1) INDICATE ON THE PLAN WHICH GAS SIZING TABLE IS BEING | | | USED FOR THE SIZING OF THE LOW PRESSURE SYSTEM. THERE | | | IS NO REFERENCE TO ANY TABLE. 2014 FBC-FUEL GAS | | | SEC.402.3. | | | 2) THE SIZE OF THE HORIZONTAL GAS PIPING TO THE DRYERS | | | MAY NOT BE ABLE TO BE 1/2" AS STATED IN THE PLAN REVIEW | | | RESPONSE. THE SIZE WILL DEPEND ON THE SIZING TABLE | | | BEING USED. THE PREVIOUS PLANS REFER TO TABLE 402.4 (1) | | | FOR THE LOW PRESSURE SYSTEM AND THE 1/2 INCH LINE WILL | | | NOT SUPPORT 495,000 BTU'S. | | | 3) MANUFACTURER'S INSTALLATION INSTRUCTIONS AND | | | SPECIFICATIONS FOR THE REGULATORS, TANKLESS WATER | | | HEATERS AND THE FLEX CONNECTOR FOR THE GENERATOR SHALL | | | BE ONSITE FOR INSPECTION. | | | 4) SHT. P3.0 SHOWS THE GAS REGULATOR TO BE VENTED TO | | | THE EXTERIOR AND SHT. P4.2 NOTES THE REGULATOR AS A | | | NON-VENTING REGULATOR. WHICH IS IT? CLARIFY. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|