| Date |
Text |
| 2018-04-24 09:26:36 | 1) SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS FOR THE NAVIEN TANKLESS WATER HEATERS. |
| | WPB AMEND. TO FBC SEC. 107.2.1, 2014 FBC-FUEL GAS |
| | SEC.305.1. THE INSTALLATION MANUAL SHALL BE ONSITE FOR |
| | INSPECTION. |
| | 2) SHT. P-3 - DETAIL 7 NOTES "GAS PRESSURE REGULATOR |
| | REDUCE GAS TO 2" WC." IS THIS SUPPOSED TO READ 2 PSI? |
| | CLARIFY. |
| | 3) SHT. P1.0 - DETAIL 1 - INDICATE THE TYPE OF MATERIAL |
| | TO BE USED FOR THE EXHAUST AND INTAKE VENTS OF THE |
| | TANKLESS WATER HEATERS.. THE TYPE OF MATERIAL SHALL |
| | COMPLY WITH THE REQUIREMENTS OF THE NAVIEN INSTALLATION |
| | MANUAL. |
| | 4) SHT. P4.2 - GAS FIXTURE LOAD SUMMARY - PLEASE REVISE |
| | THE TOTAL LOAD TO 4066.6 BTU'S. |
| | 5) SHT. P4.2 - IF THE GAS PRESSURE IS 2 PSI COMING FROM |
| | THE GAS UTILITY WHY IS 5 INCH SCH. 40 BEING INSTALLED |
| | DOWNSTREAM OF THE GAS METER AND NEW GAS REGULATOR? THE |
| | 5 INCH LINE IS OVERSIZED.CLARIFY. |
| | 6) SIZE THE SCH. 40 LINE IN ITS ENTIRETY FROM THE GAS |
| | METER TO THE GROUND PENETRATION POINT. |
| | 7) SHOW THE DISTANCE FROM EACH MP REGULATOR TO THE MOST |
| | REMOTE OUTLET ON EACH BRANCH LINE PER THE 2017 FBC-FUEL |
| | GAS SEC.402.4.1, 402.4.2. |
| | 8) SHOW THE LOCATION OF ALL MEDIUM PRESSURE REGULATORS. |
| | WPB AMEND. TO FBC SEC. 107.2.1. |
| | 9) SHT. P4.1 - SIZE THE HOT WATER RECIRCULATION LINE TO |
| | THE TANKLESS WATER HEATERS. |
| | 10) SHT. 3.0 - DETAIL 7 SHOWS A 3/4 INCH GAS LINE TO |
| | THE TANKLESS WATER HEATERS BUT SHEET P4.2 SHOWS A 2 |
| | INCH GAS LINE.CLARIFY. |
| | 11) SHT.P3.0 - DETAIL 7 - IN ADDITION TO SHOWING A 3/4 |
| | GAS CONNECTION TO THE TANKLESS WATER HEATERS, THE |
| | PIPING DIAGRAM SHOWS FOUR ADDITIONAL OUTLETS THAT |
| | APPEAR TO BE SEDIMENT TRAPS.IF THAT IS THE INTENT, THE |
| | LOCATION OF THESE TRAPS WILL ACCOMPLISH NOTHING. |
| | CLARIFY. SEDIMENT TRAPS SHALL BE LOCATED IN ACCORDANCE |
| | WITH THE 2017 FBC-FUEL GAS SEC. 408.4. |
| | 12) SHOW THE LOCATION OF THE EXHAUST AND INTAKE VENTS |
| | ON THE PARTIAL ROOF PLAN. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |