| 2018-04-19 19:50:01 | 04/19/2018 PLUMBING & GAS 1ST REVIEW**DENIED** |
| | |
| | CITY RECORDS DO NOT SHOW ANY PERMITS FOR A GAS TANKLESS |
| | WATER HEATER. |
| | |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS |
| | |
| | 1) VALUE SEEMS TOO LOW AND MUST INCLUDE THE COST OF THE |
| | OWNER SUPPLIED HEATER AT FULL VALUE. WPB AMEND TO THE |
| | 2017 FBC.FOR PERMITTING PURPOSES, VALUATION OF |
| | BUILDINGS AND SYSTEMS SHALL |
| | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL |
| | CODE CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE |
| | SET BY THE BUILDING OFFICIAL. |
| | |
| | 2) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. FGC SECS. 401.4, |
| | 401.8, 402.1, 402.2, 402.3 OR FBCR SECS.G2412.4, |
| | G2412.8, G2413.1, G2413.2, G2413. |
| | |
| | 3) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC. |
| | G2421.1. |
| | |
| | 4) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 |
| | OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE |
| | PROPER PIPE SIZE AND BTU LOAD |
| | |
| | 5) SIZING TABLE REFERENCE ONLY 2PSI SCH 40 METAL |
| | PIPING. MUST INCLUDE SIZING TABLES FOR ? LB AND CSST |
| | PIPING. SUBMIT TWO COPIES OF THE APPLICABLE SIZING |
| | TABLES USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON |
| | THE PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) |
| | FROM THE GAS CODE OR OTHER STANDARD THAT WERE USED IN |
| | THE DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 |
| | FBC-FUEL GAS SECS. 401.4, 401.8, 402.3, AND TABLES |
| | 402.4 (1) THRU 402.4 (37) OR 2017 FBC-RES. SEC. |
| | G2413.3, G2412.8, G2413.1, G2413.2, & G2413. |
| | |
| | 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | 7) SUBMIT MANUFACTURER?S INSTALLATION MANUAL FOR NEW |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND |
| | 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES |
| | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| | THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. |
| | SEC.G2408.1. |
| | |
| | 8) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| | G2413.4 (1 ) THROUGH G2413.4 (21). |
| | |
| | 9) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC. |
| | G2413.4.1, G2413.4.2. |
| | |
| | 10) PLAN ARE REQUIRED TO BE DRAWN ON SUITABLE MATERIAL. |
| | PENCIL IS NOT PERMITTED. FBC 107.2.1 |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |