| 2019-03-25 15:01:07 | 03/25/19 RESPONSE TO SHUBHAM GOWDA E-MAIL |
| | GOOD AFTERNOON SHUBHAM, |
| | THAT ELEVATION CERTIFICATE IS TOO OLD. IT LOOKS TO BE |
| | DONE BEFORE THE ADDITION. IT?S DATED 2010/01/05 BY |
| | CLYDE MCNEAL. |
| | THE ELEVATION CERTIFICATES WE NEED ARE THE ONES THAT |
| | ARE DONE DURING CONSTRUCTION. IMPORTANT: THIS PERMIT |
| | WAS ISSUED PRIOR TO THE FEMA REVISED FLOOD MAPS. THE |
| | FINISH FLOOR ELEVATIONS WERE DONE BASED ON NGVD29 |
| | VERTICAL DATUM. KEEP THIS IN MIND WHEN SUBMITTING THE |
| | ELEVATION CERTIFICATES. |
| | IF SURVEYOR USES NAVD 1988, THEN CONVERSION TO NGVD 29 |
| | WILL NEED TO BE PROVIDED. |
| | THANK YOU |
| | |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | RESIDENTIAL (R3) REVISION, SECOND BUILDING REVIEW |
| | CHECKLIST. |
| | CODE: FBC 5TH EDITION (2014). |
| | |
| | 1- A) OK. SAME ARCH. |
| | |
| | B) OK. |
| | |
| | C) OK. |
| | |
| | D) OK. |
| | |
| | |
| | ORIGINAL COMMENT: |
| | 2- SIZE OF ENTRY DOOR DOESN'T COMPLY WITH SEC. R311.2 |
| | FBC-RESIDENTIAL. NEED 32" MIN. CLEAR OPENING. REVISE AS |
| | REQUIRED. TYPICALLY 36" DOORS ARE THE ONES THAT COMPLY. |
| | |
| | RESPONSE: |
| | RESPONSE LETTER STATES "STRUCTURAL ENGINEER HAS REVISED |
| | S-1 SHEET TO SHOW CORRECT DOOR OPENING SIZE". SHEET S-1 |
| | SHOWS 5'-4" OPENING SIZE. DOUBLE 3'X8' DOORS DON'T FIT |
| | IN THIS OPENING. REVISE AS REQUIRED. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | ORIGINAL COMMENT: |
| | 3- SPECIFY ON PLANS THE EXISTING HOUSE AND EQUIPMENT |
| | FINISH FLOOR ELEVATION AND THE PROPOSED ADDITION AND |
| | EQUIPMENT FINISH FLOOR ELEVATION. SEC. 94-546 CITY |
| | ORDINANCE. NOTE: APPROVED PLANS SPECIFIED THE EXISTING |
| | AND PROPOSED FINISH FLOOR ELEVATION TO BE 8.05'. BEFORE |
| | 10/05/17 CITY ORDINANCE REQUIRED 1 FOOT FREE BOARD |
| | ABOVE THE BASE FLOOD ELEVATION. THEREFORE, THIS |
| | ELEVATION WAS IN COMPLIANCE. ELEVATION CERTIFICATES |
| | WILL BE REQUIRED DURING CONSTRUCTION. |
| | |
| | RESPONSE: |
| | REPEAT COMMENT. ELEVATION CERTIFICATES HAVE NOT BEEN |
| | SUBMITTED FOR REVIEW. |
| | |
| | ORIGINAL COMMENT: |
| | 4- SHEET S-6: DOORS AND WINDOWS DESIGN PRESSURES SHOWN |
| | ON 1ST AND 2ND FLOOR PLAN DON'T MATCH DESIGN PRESSURES |
| | SHOWN ON THE TABLE ON SAME SHEET. REVISE AS REQUIRED TO |
| | MATCH. ALSO, DESIGN PRESSURES CAN NOT BE LOWER ON THE |
| | SECOND FLOOR THAN THE FIRST FLOOR. DESIGN PRESSURES CAN |
| | NOT BE LOWER FOR OPENINGS THAT ARE SMALLER. REVISE AS |
| | REQUIRED. NOTE: THE EDGE DISTANCE IS 4'-0" MIN AS |
| | REQUIRED BY NOTE AT THE BOTTOM OF FIGURE R301.2(7) |
| | FBC-RESIDENTIAL. REVISE AS REQUIRED. |
| | |
| | RESPONSE: |
| | REPEAT COMMENT. NOT ADDRESSED. |
| | RESPONSE LETTER STATES "STRUCTURAL ENGINEER HAS REVISED |
| | S-6 TO SHOW WIND PRESSURES". DRAWING WAS NOT REVISED. |
| | |
| | 5- OK. |
| | |
| | 4- OK. |
| | |
| | ORIGINAL COMMENT: |
| | 5- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | FAC 61G20-3.001 FOR SECOND FLOOR BALCONY DECK COVERING. |
| | AND, CLEARLY IDENTIFY WHICH APPROVED ASSEMBLY IS GOING |
| | TO BE USED. NOTE: COORDINATE WITH ITEM #5 ABOVE. |
| | |
| | RESPONSE: |
| | REPEAT COMMENT. PRODUCT APPROVAL NOT SUBMITTED. |
| | |
| | 6- OK. |
| | |
| | IMPORTANT NOTES: |
| | (1) ELEVATION CERTIFICATES WILL BE REQUIRED DURING |
| | CONSTRUCTION. (********ELEVATION CERTIFICATES NO |
| | PROVIDED YET AS OF 03/19/19). |
| | (2)GARAGE FLOOD VENTS NEED TO BE INSTALLED BELOW THE |
| | BASE FLOOD ELEVATION (********ELEVATION CERTIFICATES NO |
| | PROVIDED YET AS OF 03/19/19). |
| | (3) ORIGINAL PERMIT WAS APPROVED WITH PROVISO. PROVIDE |
| | REQUIRED INFORMATION . SEE COPY OF PROVISO BELOW. |
| | (*****NOT ADDRESSED YET AS OF 03/19/19). |
| | |
| | |
| | ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO HELP EXPEDITE THE REVIEW PROCESS. |
| | ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| | DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY |
| | REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | BUILDING REVIEW APPROVED WITH PROVISO: ******(DATED |
| | 02/01/17) |
| | 1- PROVIDE COMPLETE DETAILS/SPECIFICATIONS FOR THE |
| | INSTALLATION OF BRICK VENEER, INCLUDING VENEER SUPPORTS |
| | AT OPENINGS. ALSO, SPECIFY WEEP-HOLES, ETC. |
| | NOTE: PROVIDE COMPLETE DETAILS/ SPECIFICATIONS. DON'T |
| | CITE CODE SECTIONS. |
| | |
| | 2- ENERGY CALCULATIONS WERE REVISED FOR FULL HOUSE |
| | COMPLIANCE INSTEAD OF ADDITION ALONE: |
| | A) REVISE CEILING INSULATION ITEM #10 TO MATCH PLANS. |
| | VENTED AND UNVENTED ROOFS. |
| | B) REVISE ROOF MATERIAL SHOWN ON PAGE 2 OF 5 TO MATCH |
| | PLANS AND PRODUCT APPROVALS SUBMITTED. |
| | C) REVISE CONCRETE BLOCK INSULATION ITEM #9 DOESN'T |
| | MATCH PLANS. SEE DETAIL #2 ON SHEET A-10. |
| | D) REVISE R-VALUE SHOWN ON THE CEILING INSULATION ON |
| | PAGE 3 OF 5 TO MATCH PLANS AND INFORMATION SHOWN ON |
| | ITEM #10. |
| | E) REVISE DOOR TYPE SPECIFIED ON PAGE 3 OF 5 TO MATCH |
| | PLANS AND PRODUCT APPROVALS SUBMITTED. THERE ARE NO |
| | INSULATED DOORS. DOORS WITH GLASS NEED TO BE INCLUDED |
| | IN THE WINDOWS AREA. |
| | F) REVISE WINDOWS OVERHANG DEPTH AND SEPARATION TO |
| | MATCH PLANS. |
| | G) REVISE NUMBER OF OCCUPANTS ON PAGE 2 OF 5. WHY 20 |
| | PEOPLE IN A SINGLE FAMILY RESIDENCE. |
| | H) REVISE FLOOR TYPES ON PAGE 2 OF 5. 2ND FLOOR IS NOT |
| | ON SLAB ON GRADE. |
| | |
| | 3- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | FAC 61G20-3.002(33) FOR: |
| | A) GARAGE DOORS THAT MEETS ALL THE DESIGN LOADS SHOWN |
| | ON SHEET S-6 (POSITIVE AND NEGATIVE). |
| | B) DOUBLE EXTERIOR DOORS THAT MEET THE DESIGN PRESSURES |
| | SPECIFIED ON PLANS. |
| | |
| | 4- ENGINEER OF RECORD TO REVIEW AND APPROVE ABOVE |
| | PRODUCT APPROVALS. |