| Date |
Text |
| 2018-05-31 17:44:01 | 1ST REVIEW: FBC 2017 6TH EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHT. ALS-1-2 THE PLUMBING FIXTURE COUNT STATES A |
| | OCCUPANT LOAD OF 90 THE 2ND FLOOR OCCUPANT LOAD IS |
| | LISTED AT 119 PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 2. SHT. A9-5-1 THE SHOWER IN THE WOMENS APPEARS TO BE A |
| | ALTERNATE ROLL-IN THE DEPTH OF THE SHOWER IS SHOWN AS |
| | 371/4" THE CODE CALLS OUT FOR A HARD DIMENSION OF 36" |
| | SHALL COMPLY WITH FBC PL 608.2.3 |
| | |
| | 3. SHT. A9-5-1 PLEASE SHOW DIMENSIONS OF THE SHOWER IN |
| | THE MENS BATHROOM. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 4. SHT A9-5-2 SHT. A9-5-2 THE TOILET IN THE BATHROOMS # |
| | 203,205,208 SHALL COMPLY WITH FBC PL 604.2 |
| | |
| | 5. SHT. A9-5-9 THE GRAB BARS FOR THE TOILET IN |
| | BATHROOMS # 203,205, 208 SHALL COMPLY WITH FBC PL |
| | 604.5.1 AND 604.5.2 , 609.4 |
| | |
| | 6. SHT. A9-5-9 THE SHOWERS IN BATHROOMS # 203,205,208 |
| | SHALL COMPLY WITH FBC PL 608 PLEASE INDICATE ON THE |
| | PLAN WHICH TYPE OF SHOWER COMPARTMENT THEY ARE DESIGNED |
| | TO TO MEET AND SHOW ALL DIMENSIONS. PER WPB AMEND TO |
| | FBC 107.2.1 |
| | |
| | 7. SHT A9-5-9 SHOW COMPLIANCE WITH FBC PL 608.3 THE |
| | GRAB BARS IN-THE SOWERS FOR BATHROOMS # 203,205,208 |
| | |
| | 8. SHT. P5.1 THE SHOWER IN BATHROOM 203, 208 MEN'S |
| | BATHROOM IN BASEMENT ARE SHOWING A HORIZONTAL DRY VENT |
| | AND ARE NOT CODE COMPLIANT ALL DRY VENTS SHALL COMPLY |
| | WITH FBC PL 905.3, 905.4 |
| | |
| | 9. SHT. P5.1 THE TOILET 203 IS NOT VENTED PROPERLY IT |
| | SHALL BE VENTED BEFORE CONNECTING TO THE BUILDING |
| | DRAIN. PER FBC PL 901.2.1 |
| | |
| | 10. SHT. P5.1 WHAT VENTING SYSTEM FROM FBC PL CH. 9 ARE |
| | THE TOILETS IN THE BASEMENT BATHROOMS DESIGNED TO MEET |
| | IF IT IS A CIRCUIT VENT IT SHALL HAVE A VENT BETWEEN |
| | THE TWO MOST UP STREAM FIXTURES AND THE VENT HAS TO BE |
| | DRY . PER FBC PL 914.2 |
| | |
| | 11. PROVIDE A SITE PLAN THAT SHOWS THE CONNECTION OF |
| | THE SANITARY AND WATER TO THE CITY SYSTEMS. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 12. THE NEW SANITARY FROM THE UPPER FLOORS CAN NOT |
| | DISCHARGE TO THE SUMP PIT IN THE BASEMENT IT SHALL |
| | CONNECT TO THE GRAVITY SYSTEM CONNECTED TO THE CITY |
| | TAP. PER FBC PL 712.1 |
| | |
| | 13. I UNDERSTAND THAT THE SUMP PUMP WILL BE DONE BY |
| | OTHER BUT PLEASE PROVIDE THE CAPACITY OF THE SUMP PIT |
| | AND PUMP AND A BASIC PIPING DETAIL. |
| | |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |