| Date |
Text |
| 2018-05-22 12:04:49 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #18040104 |
| | 5/22/18 |
| | |
| | CODES IN EFFECT: |
| | FBC BC- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC MC- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC RE- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC-SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE AC AND ENERGY CALCULATIONS ARE NOT |
| | ELECTRONICALLY SIGNED AND SEALED. PLEASE REFER TO RULE |
| | 61G15-23.005: ENGINEERING PLANS, SPECIFICATIONS. |
| | REPORTS OR OTHER DOCUMENTS WHICH MUST BE SIGNED, DATED |
| | AND SEALED IN ACCORDANCE WITH THE PROVISIONS OF SECTION |
| | 471.025 FS, AND RULE 61G15-23.001 FAC MAY BE SIGNED |
| | ELECTRONICALLY AS PROVIDED HEREIN BY THE PROFESSIONAL |
| | ENGINEER IN RESPONSUIBLE CHARGE. |
| | |
| | 2) ENERGYGAUGE FORM: A) COMPLIANCE DATA FOR AHU'S 5, 6, |
| | 7, & 8 HAS NOT BEEN PROVIDED. B) RTU-1 LISTED AT 93,300 |
| | BTUH IN THE ENERGY COMPLIANCE DATA IS NOT SHOWN IN THE |
| | AC EQUIPMENT SCHEDULES. C) THE 52820 BTUH COOLING |
| | CAPACITY FOR VAV-3 SHOWN IN THE CALCS DOES NOT MATCH |
| | THE CAPACITY SHOWN IN THE EQUIPMENT SPECIFICATIONS ON |
| | SHEET M7.1. |
| | |
| | 3) SHEETS ALS.01 & M0.1: THE PLANS SHALL BE DESIGNED IN |
| | ACCORDANCE WITH THE FLORIDA BUILDING CODES SIXTH |
| | EDITION 2017. PLEASE UPDATE THE CODE DATA, AND THE NOA |
| | FOR THE ROOF STAND. NOA #13-1017.09 HAS BEEN SUPERSEDED |
| | BY NOA #15-0902.05. |
| | |
| | 4) M2.5 & M7.1: RTU-1 IS MISLABLED AS RTU-2 ON THE ROOF |
| | PLAN. SHOW THE LOCATION OF THE 7.5 TON RTU FOR THE |
| | BUSINESS LOUNGE. |
| | |
| | 5) PROVIDE COMPLETE VENTILATION CALCULATIONS FOR ALL |
| | ROOMS AND SPACES IN ACCORDANCE WITH TABLE 403.3.1.1 FBC |
| | MC. PROVIDE A SCHEDULE THAT INDICATES THE REQUIRED AND |
| | PROVIDED CFMS OF OUTDOOR AIR, AND EXHAUST AIR WHERE |
| | REQUIRED. |
| | |
| | 6) M0.1 & M2.1: DUCT SMOKE DETECTORS ARE REQUIRED FOR |
| | THE MMU SUPPLY SYSTEMS PER SECTION 606.2.2 FBC MC. |
| | PLEASE SEE EXCEPTION 2 WHICH ALLOWS SMOKE DETECTORS TO |
| | BE PLACED IN THE RETURN AIR PLENUMS. |
| | |
| | 7) M2.1: THE PLAN APPEARS TO SHOW ONLY 135 CFMS OF |
| | OUTSIDE AIR FOR ALL THE OCCUPIED SPACES ON THE FLOOR. |
| | SEE COMMENT #4 ABOVE AND PROVIDE CALCULATIONS. |
| | |
| | 8) M2.1: PROVIDE A MEANS OF RETURN AIR FOR THE SYSTEM. |
| | |
| | 9) M2.1:USING THE CORRIDOR FOR MAKEUP AIR FOR THE |
| | TOILET ROOM EXHAUST SYSTEMS REQUIRES THE CORRIDOR TO BE |
| | DIRECTLY SUPPLIED WITH OUTDOOR AIR AT A RATE GREATER |
| | THAN THE RATE OF MAKEUP AIR TAKEN FROM THE CORRIDOR- |
| | SECTION 601.2 (1) FBC MC. |
| | |
| | 10) M2.2: SHOW HOW IS AIR BEING RETURNED FOM THE |
| | CONFERENCE AND OFFICE ROOMS- SECTION 601.6 FBC MC. |
| | |
| | 11) M2.5: PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY |
| | DUCT OF RTU-1 (RTU-2 ON THE PLAN- SEE COMMENT #4). |
| | |
| | 12) P2.5: PROVIDE A DETAIL SHOWING HOW THE CONDENSATE |
| | PIPING WILL BE SUPPORTED ON THE ROOF- TYPE AND SPACING |
| | OF SUPPORTS |
| | |
| | 13) PROVIDE TWO COPIES OF NOA #15-0902.05. ACKNOWLEDGED |
| | THAT COMPLETE STRUCTURAL ENGINEERING FOR INSTALLATION |
| | OF THE RTU'S WILL BE A DEFERRED SUBMITTAL PER NOTE ON |
| | M6.1. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | |