2018-05-31 16:05:2105/31/2018 2ND PLUMBING REVIEW**DENIED**
  
 COMMENTS NOT ANSWERED FROM 1ST REVIEW
  
 1) TOTAL JOB VALVE SEEMS LOW. PER WPB AMEND 109.3
 PROVIDE A SIGN BONA FIDE CONTRACT.
  
 2) PROVIDE A DETAIL ON WHERE THE AUTO FILL CONNECTION
 WILL BE MADE AND LOCATION OF THE BACKFLOW. ALSO A
 SEPERATE PERMIT FOR THE ISOLATION BACK IS REQUIRED AND
 CITY ORD #2853-95 ALSO REQUIRES A RPZ AT THE METER
 WHICH YOU CAN DO BOTH BACKFLOWS ON 1 PERMIT.
  
 NEW COMMENTS:
  
 1) SHT. S-1 REFERS TO AIR TEST OF PVC PIPING. PLASTIC
 PIPING IS NOT APPROVED TO BE TESTED BY MEANS OF AIR.
 FBC P 312.1
  
 2) SHT. 2 SAYS POOL PIPING IS NOT SUBJECT TO THE FBC
 PLUMBING 2017 AND TO SEE BOAF INTERPRETATION. I WAS NOT
 ABLE TO LOCATE ANY INTERPRETATION JUST A QUESTION
 REGRADING THE USE OF FLEX PVC. REMOVE ENTIRE COMMENT.
 FBC 107.2.1
  
 3) SHT .2 SAYS CONTRACTOR MAY PLUMB THE POOL IN ANY
 OTHER WAY TO IMPROVE EFFICIENCY. NO CHANGE FROM THE
 APPROVED PLAN ARE PERMITTED IN THE FIELD WITH OUT A
 REVISION. REMOVE ENTIRE COMMENT. FBC 107.2.1
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  