| Date |
Text |
| 2018-04-11 16:19:49 | 04/11/2018 1ST GAS REVIEW**DENIED** |
| | |
| | YOU HAVE SUBMITTED A GAS PERMIT APPLICATION BUT HAVE |
| | NOT INCLUDED ANY INFORMATION ON THE GAS SYSTEM. I HAVE |
| | INCLUDED A GAS PERMIT CHECK LIST IN YOUR PERMIT PACKET |
| | AND HIGHLIGHTED THE REQUIRED FIELDS YOU WILL NEED TO |
| | ADDRESS. |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | GAS PERMIT APPLICATION REQUIREMENTS |
| | |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC. |
| | G2413.4.1, G2413.4.2. |
| | |
| | 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING |
| | |
| | (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO |
| | FBC SEC.107.2.1. |
| | |
| | 3. TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | 4. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| | G2413.4 (1 ) THROUGH G2413.4 (21). |
| | |
| | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. |
| | SEC. G 2413.4.1, G2413.4.2. |
| | . |
| | |
| | 6. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | |
| | 7. SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL |
| | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) |
| | THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8, |
| | G2413.1, G2413.2, & G2413.3. |
| | |
| | 8. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS |
| | SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4. |
| | |
| | 9. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC. |
| | G2421.1. |
| | |
| | 10.SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 |
| | OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE |
| | PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |