| Date |
Text |
| 2019-12-04 11:21:10 | |
| | REVISED 12/04/19 AND RESPONDED E-MAIL TO PAUL HALL |
| | (CONTRACTOR) PROVIDING CLARIFICATIONS. JG. |
| | |
| | NOTE: |
| | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO |
| | MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER |
| | THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID |
| | CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR |
| | TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME |
| | OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT |
| | ISSUANCE. |
| | |
| | |
| | |
| | |
| | |
| | CONSTRUCTION OF NEW OFFICE/WAREHOUSE STRUCTURE. THIRD |
| | BUILDING REVIEW CHECKLIST. |
| | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| | |
| | 1- IMPACT FEES - |
| | PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL |
| | (561) 233-5025. UPON APPROVAL OF PLANS, YOU MAY CHECK |
| | OUT ONE PLAN SET AND TAKE TO THAT OFFICE FOR REVIEW. |
| | PLEASE RETURNED STAMPED AND WITH A COPY OF THE RECEIPT |
| | AS APPLICABLE. PLEASE PROVIDE THE MUNICIPAL IMPACT FEE |
| | QUESTIONNAIRE FORM TO THE PBC IMPACT FEE OFFICE. THE |
| | FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/AD |
| | MINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF |
| | |
| | |
| | 2- OK |
| | |
| | ORIGINAL COMMENT. |
| | 3- SHEET LS-1: |
| | A) TYPE III-B CONSTRUCTION TYPE SPECIFIED IN THE DESIGN |
| | CRITERIA REQUIRES 2 HR FIRE RESISTANCE RATING FOR THE |
| | EXTERIOR WALLS. SEE BY TABLE 601 FBC-BUILDING. PROVIDE |
| | COMPLETE DETAIL/SPECIFICATIONS SHOWING COMPLIANCE WITH |
| | THE 2 HR FIRE RATED ASSEMBLY. |
| | |
| | RESPONSE: |
| | THE REVISED PLANS SPECIFY 2 HOUR WALL FOR THE SOUTH AND |
| | EAST EXTERIOR WALLS ONLY. THIS IS INCORRECT. IF THE |
| | CONSTRUCTION TYPE IS III-B, THEN ALL 4 EXTERIOR BEARING |
| | WALLS OF THIS BUILDING NEED TO BE 2 HOUR. REVISE PLANS |
| | AS REQUIRED. |
| | ALSO, PROVIDE COMPLETE WALL DETAIL OF THE SPECIFIED 2 |
| | HOUR WALL ASSEMBLY U905. NO DETAIL WAS PROVIDED AS |
| | REQUESTED ON PREVIOUS CHECKLISTS. |
| | |
| | |
| | 4- OK. |
| | 5- FBC-ACCESSIBILITY. |
| | A) OK |
| | B) OK |
| | C)OK |
| | |
| | ORIGINAL COMMENT: |
| | 6- LOCATION OF ATTIC ACCESS DOESN'T SEEM TO PROVIDE THE |
| | MIN. 30" CLEAR HEADROOM AS REQUIRED BY SEC. 1209.2 FBC. |
| | REVISE AS REQUIRED. |
| | |
| | RESPONSE (REVISED 12/04/19 FOR CLARIFICATION): |
| | SECOND FLOOR CEILING WAS REPLACED WITH 2' X 4' |
| | ACOUSTICAL CEILING. NEED TO REVISE DETAILS W2 AND W3 ON |
| | SHEET LS-1 TO MATCH NEW CEILING SPECIFICATIONS. SEC. |
| | 107.2.1 CITY AMENDMENTS. |
| | |
| | 7- OK. |
| | 8- OK |
| | 9- OK. |
| | 10- OK |
| | |
| | 11- ENERGY CALCULATIONS: |
| | ORIGINAL COMMENT: |
| | A) ARCHITECT OF RECORD TO CERTIFY (SIGNATURE AND |
| | LICENSE NUMBER) ON ENERGY FORM AS REQUIRED BY SEC. |
| | C103.1.1.1.2 FBC-ENERGY CONSERVATION. |
| | |
| | RESPONSE: |
| | REPEAT COMMENT. ARCHITECT'S RESPONSE LETTER STATES THAT |
| | A SIGNATURE WAS PROVIDED. THERE ARE NO SIGNATURES OF |
| | THE ARCHITECT ON THE ENERGY FORMS SUBMITTED. |
| | ALSO, ACCORDING TO PLANS SUBMITTED, IT LOOKS LIKE THE |
| | ARCHITECT IS DESIGNING THE BUILDING, ELECTRICAL AND |
| | PLUMBING SYSTEMS. PROVIDE SIGNATURE AND LICENSE NUMBERS |
| | ON EACH TRADE THE ARCHITECT IS RESPONSIBLE FOR THE |
| | DESIGN. |
| | NOTE: AT THE BOTTOM OF THE CERTIFICATIONS PAGE THERE IS |
| | A FOOTNOTE STATING THAT THE NAMES AND REGISTRATION |
| | NUMBERS MAY BE USED WHERE ALL THE INFORMATION IS |
| | CONTAINED IN THE SIGNED AND SEALED PLANS. THIS MAY BE |
| | DONE ALSO. BUT MAKE SURE EACH TRADE IS SHOWING THE |
| | DESIGNER OF RECORD. |
| | |
| | NEW COMMENT BASED ON CERTIFICATION PAGE SUBMITTED AT |
| | THIS TIME: |
| | THE OWNER SIGNED ON THE OWNER/AGENT SPACE LAST TIME. |
| | THIS TIME THIS SPACE WAS SIGNED BY SOMEONE ELSE. ONLY |
| | THE OWNER, THE OWNER'S ARCHITECT OR OTHER AUTHORIZED |
| | AGENT LEGALLY DESIGNED BY THE OWNER CAN SIGN THE FORM. |
| | OWNER NEEDS TO SIGN THE FORM OR SINCE THE PERSON |
| | SIGNING ON THIS SPACE IS NOT THE ARCHITECT, THEN |
| | PROVIDE PROOF THAT THE PERSON SIGNING THE FORM IS THE |
| | OWNER'S LEGALLY DESIGNATED AGENT AS REQUIRED BY SEC. |
| | C103.2 FBC-ENERGY CONSERVATION. |
| | |
| | |
| | B) OK. |
| | C) OK |
| | D) OK |
| | |
| | ORIGINAL COMMENT: |
| | E)PLANS WERE REVISED. LOCATION OF WINDOWS CHANGED. |
| | REVISE AS REQUIRED. SEC. 107.2.1 CITY AMENDMENTS. |
| | |
| | RESPONSE: |
| | NOT ADDRESSED. NOW THERE IS NOT INFORMATION FOR THE |
| | WINDOWS. PROVIDE COMPLETE INFORMATION. SEC. 107.2.1 |
| | CITY AMENDMENTS. |
| | |
| | |
| | 12- OK. |
| | 13- OK. |
| | 14- OK. |
| | |
| | ORIGINAL COMMENT: |
| | 15- FLAT ROOF NOA 14-0627.05 SUBMITTED: CLEARLY MARK |
| | WHICH APPROVED ASSEMBLY IS GOING TO BE INSTALLED TO |
| | VERIFY COMPLIANCE WITH THE DESIGN PRESSURES OF SEC. |
| | 1609.1 FBC. NOTE: IF THE SELECTED ASSEMBLY DOESN'T MEET |
| | THE DESIGN PRESSURES FOR ALL ROOF ZONES, THEN SIGNED |
| | AND SEALED RAS 117 CALCULATIONS ARE REQUIRED. |
| | |
| | RESPONSE: |
| | THIS WILL BE A PROVISO. THE INFORMATION WILL NEED TO BE |
| | PROVIDED FOR REVIEW PRIOR TO INSPECTIONS TO AVOID |
| | CONFLICTS/DELAYS. |
| | |
| | ORIGINAL COMMENT: |
| | 15(1)- PROVIDE ICC EVALUATION REPORT FOR ICYNENE SPRAY |
| | INSULATION SPECIFIED ON PLANS. AND ARCHITECT OF RECORD |
| | TO REVIEW/APPROVE PRIOR T SUBMITTAL. SEC. 2603 FBC. |
| | |
| | RESPONSE: |
| | THIS WILL BE A PROVISO. THE INFORMATION WILL NEED TO BE |
| | PROVIDED FOR REVIEW PRIOR TO INSPECTIONS TO AVOID |
| | CONFLICTS/DELAYS. |
| | |
| | |
| | 16- OK. |
| | 17- OK. |
| | |
| | 18- TRUSS PACKAGE (REVISED 12/04/19): |
| | IT IS MY UNDERSTANDING THAT TRUSS TO TRUSS CONNECTIONS |
| | ARE THE RESPONSIBILITY OF THE TRUSS ENGINEER (ANSI/TPI |
| | 1). NOTE #9 OF HIP GIRDER A10 AND NOTE # 6 OF FLOOR |
| | GIRDER FG1 SPECIFY THAT THE SELECTION OF CONNECTORS IS |
| | THE RESPONSIBILITY OF OTHERS. THESE ARE TRUSS TO TRUSS |
| | CONNECTIONS, THEREFORE THE TRUSS ENGINEER NEEDS TO |
| | SPECIFY THE CONNECTORS AND PROPERLY SIGN AND SEAL THE |
| | SHEETS WERE CONNECTOR IS SPECIFIED. |
| | ARCHITECT RESPONSE LETTER STATES THAT "SEE DETAIL |
| | 1/LS-1 FOR DETAIL, AND ATTACHED TRUSS PACKAGE". THIS |
| | DETAIL IS INCORRECT. THE HANGERS ARE NOT BY THE TRUSS |
| | COMPANY. THEY ARE THE RESPONSIBILITY OF THE TRUSS |
| | ENGINEER. |
| | |
| | 19- DESIGNER OF RECORD TO REVIEW REVISED TRUSS PACKAGE, |
| | INCLUDING INDIVIDUAL TRUSSES BEFORE SUBMITTAL TO THIS |
| | OFFICE. SEC. 107.3.4.1 CITY AMENDMENTS. |
| | NOTE: THIS APPLIES ONCE TRUSS PACKAGE ITEMS ARE |
| | CORRECTED. |
| | |
| | 20- OK. |
| | |
| | 21- WELDED OR BOLTED CONNECTIONS (FYI) |
| | THE CONTRACTOR IS REQUIRED TO PROVIDE WELD PROCEDURE |
| | SPECIFICATIONS & WELDER OPERATOR PERFORMANCE |
| | QUALIFICATION RECORDS IN ACCORDANCE WITH THE REFERENCED |
| | STANDARDS AT TIME OF INSPECTION. |
| | 2017 FBC-B 2204.1 WELDING |
| | 2017 FBC-B 2204.2 BOLTING. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | PLEASE, INSERT CORRECTED PAGES INTO THE SUBMITTAL AND |
| | REMOVE/VOID THE PREVIOUSLY REVIEWED SHEETS. |
| | PLEASE DON'T STAPLE OLD DRAWINGS/DOCUMENTS . SUBMIT OLD |
| | DRAWINGS/DOCUMENTS FOR REFERENCE. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |