Plan Review Notes
Plan Review Notes For Permit 18031221
Permit Number 18031221
Review Stop E
Sequence Number 2
Notes
Date Text
2018-08-31 13:02:26CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED
 SATISFACTORILY ARE MARKED AS CORRECTED. PREVIOUS
 COMMENTS THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY
 HAVE ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW
 COMMENTS WILL BE LISTED AFTER PREVIOUS COMMENTS.
  
 1. CORRECTED.
 2. CORRECTED.
 3. CORRECTED.
 4. CORRECTED.
 5. CORRECTED.
 6. HOW WILL THE 500 AMP FUSE BE INSTALLED IN A 1600 AMP
 PIECE OF EQUIPMENT? PANEL MSB IS SHOWN WITH A 1600 AMP
 FUSE. OBVIOUSLY, THE FUSE SIZE WOULD BE DIFFERENT.
 PROVIDE CLARIFICATION. NEC110.3; FBC 107.2.1 (BY
 SEARCHING ONLINE, I WAS NOT ABLE TO FIND A REDUCER FROM
 1600 AMPS TO 600 AMPS. PROVIDE MANUFACTURERS SPEC SHEET
 FOR THIS PRODUCT. AS A SIDE NOTE, WHY IS THIS BEING
 INSTALLED, AS THE CONDUCTORS AND SERVICE EQUIPMENT
 UPSTREAM ARE PROTECTED AT 600 AMP? IT SEEMS THE
 ORIGINAL FUSES COULD REMAIN IN PLACE, AS EVERYTHING
 AHEAD OF IT IS PROTECTED. NO CODE VIOLATION WITH
 CHANGING THE FUSE, BUT WE WILL NEED TO SEE A LISTED
 PRODUCT FOR THIS.)
 7. CORRECTED.
 8. PROVIDE ACCURATE LOAD BREAKDOWN. THE CURRENT
 EXPLANATION SHOWS THE NEW NORMAL LOAD TO BE 116 KW AND
 THE EMERGENCY LOAD TO BE 113 KW, BUT THE TOTAL PEAK
 DEMAND OF ONLY 113 KW. WHAT ARE THE LOADS FOR THE
 INDIVIDUAL SYSTEMS AND IS THE TOTAL CAPABLE OF BEING
 SUPPORTED BY THE NEW GENERATOR? PROVIDE CLARIFICATION.
 NEC 517.41(C) (AN ACCURATE LOAD CALCULATION, OR
 EQUIVALENT, WAS NOT PROVIDED. A FUTURE RECORDING IS NOT
 ACCEPTABLE. THIS INSTALLATION CANNOT BE APPROVED UNTIL
 ONE OF THE METHODS FOR LOAD DETERMINATION IS PROVIDED.
 IF NEC 220.87 IS INTENDED, A CERTIFIED RECORDING FOR 30
 DAYS WILL BE REQUIRED, OR DEMAND LOAD FOR A ONE YEAR
 PERIOD. ALL 3 ITEMS IN 220.87 ARE REQUIRED FOR APPROVAL
 UNDER THIS SECTION.)
 9. PROVIDE DETAIL OF SEPARATION OF THE LIFE SAFETY
 BRANCH THE CRITICAL BRANCH. NEC 517.41(D) (BASED ON
 LOAD PROVIDED IN COMMENT 8, THIS MAY NOT BE NECESSARY
 IF LESS THAN 150 KW OF TOTAL LOAD.)
 10. CORRECTED.
  
 NEW COMMENT:
  
 11) WITH THE NEW DESIGN, PANEL MSB HAS BECOME A
 DOWNSTREAM PANEL AND IS REQUIRED TO HAVE THE GROUNDS
 AND NEUTRALS SEPARATED, AS WELL AS AN EGC INSTALLED IN
 THE EXISTING CONDUITS. THE GROUNDING ELECTRODE SYSTEM
 IS REQUIRED TO BE TIED IN AT THE MAIN SERVICE. PROVIDE
 CORRECTION. NEC 250.6, 250.24, 250.28, 250.30, 250.110,
 250.142(B)
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  