Plan Review Notes
Plan Review Notes For Permit 18031213
Permit Number 18031213
Review Stop G
Sequence Number 1
Notes
Date Text
2018-04-03 10:06:4204/03/2018 1ST GAS REVIEW**DENIED**
  
 1) YOUR VALUE OF TOTAL JOB SEEMS LOW. PER WPB AMEND TO
 THE FBC 109.3 PROVIDE A SIGNED BONA FIDE CONTRACT
 SHOWING TOTAL JOB VALUE.VALUE MUST INCLUDE THE COST OF
 THE GAS COOK TOP ALONG WITH ALL MATERIAL, LABOR,
 OVERHEAD, AND PROFIT.
  
 2) PROVIDE COOK TOP MANUFACTURE INSTALLATION MANUAL.
 VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1
  
 3) CITY RECORDS SHOW AN EXISTING GAS POOL HEATER LISTED
 AT 405,000 BTU THAT IS NOT SHOWING ON YOUR ISOMETRIC.
 LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU
 LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
  
 4) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE NEW
 COOK TOP PER THE 2017 FBC-FUEL GAS CODE SEC.304.1, 2017
 FBC-RES. SEC. G 2407.1
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved