2019-02-11 05:31:091) A REVISED ORIGINAL PERMIT APPLICATION FOR THE GAS
 INSTALLATION MUST BE SUBMITTED. THE GAS PLAN SHOWS A
 FUTURE GENERATOR AND A POOL HEATER BUT THESE APPLIANCES
 ARE NOT LISTED ON THE GAS APPLICATION. WPB AMEND. TO
 FBC SEC. 107.2.1.
 2) THERE ARE TWO DIFFERENT GAS DRAWINGS IN THE PERMIT
 SUBMITTAL PACKAGE. REMOVE ALL OLD DOCUMENTS FROM THE
 SUBMITTAL PACKAGE AND SUBMIT TWO COMPLETE SETS OF PLANS
 SHOWING THE ENTIRE SCOPE OF WORK. WPB AMEND. TO FBC
 SEC. 107.2.1.
 3) IDENTIFY THE MODEL OF GENERATOR TO BE INSTALLED ON
 THE MANUFACTURER'S SPECIFICATION SHEET. IS IT THE 9 OR
 11 KW? SHOW THE LOCATION OF THE GENERATOR ON THE PLANS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 FIREPLACE. ONLY THE SPECIFICATIONS FOR THE SHUTOFF
 VALVE HAVE BEEN SUBMITTED. EQUIPMENT SHALL BE LISTED
 AND LABELED. 2017 FBC-RES. SEC. G2404.3.THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1, FBC-RES. SEC.G2408.1.
 5) SUBMIT ADDITIONAL INFORMATION FOR THE GAS DRYER.
 WHAT HAS BEEN SUBMITTED INTERNET CONSUMER INFORMATION
 AND NOT MANUFACTURER'S SPECIFICATIONS. EQUIPMENT SHALL
 BE LISTED AND LABELED. 2017 FBC-RES. SEC. G2404.3. THE
 SPEC SHEETS SHALL SHOW THE BTU LOAD OF THE APPLIANCE.
 6) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE GAS
 APPLIANCES. 2017 FBC-FUEL GAS SEC. G2407.1, G2439.4,
 G2406.2, G2407.5.
 7) ) THE GAS PLAN SHOWS 3 DIFFERENT TYPES OF PIPING
 MATERIAL TO BE INSTALLED YET YOU REEFERENCE ONLY ONE
 GAS SIZING TABLE WHICH IS FOR PE PIPE. SUBMIT TWO
 COPIES OF THE APPLICABLE SIZING TABLES USED TO SIZE THE
 GAS SYSTEM OR PLACE A NOTE ON THE PLANS/DRAWINGS
 SPECIFYING WHICH SIZING TABLE(S) FROM THE GAS CODE OR
 OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS GAS
 SYSTEM. REFER TO THE 2017 FBC-FUEL GAS SECS. 401.4,
 401.8, 402.3, AND TABLES 402.4 (1) THRU 402.4 (37) OR
 2017 FBC-RES. SEC. G2413.3, G2412.8, G2413.1, G2413.2,
 & G2413.3.
 8) THE GAS SIZING TABLE REFERENCED ON THE PLAN IS FOR A
 SYSTEM LESS THAN 2 PSI YET THE GAS DRAWING SHOWS A 2
 PSI SYSTEM. CLARIFY.
 9) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. 2014 FGC
 SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
 10) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
 11) SHOW THE CORRESPONDING EHD OF THE CSST THAT IS
 BEING USED AND IDENTIFY THE SIZING TABLE FROM THE GAS
 CODE USED TO SIZE THE PIPING. WPB AMEND. TO FBC SEC.
 107.2.1.
 12) IDENTIFY ALL THE APPLIANCES ON THE GAS RISER AND
 SHOW THE LOCATION OF ALL GAS APPLIANCES AND EQUIPMENT
 ON SHEETS A-00 & A-01. WPB AMEND. TO FBC SEC. 107.2.1.
 13) SHT. A-00 SHOWS 2 SEPARATE GAS BRANCH LINES PIPED
 TO THE EAST SIDE OF THE STRUCTURE. IDENTIFY THE
 APPLIANCE/EQUIPMENT THAT WILL BE CONNECTED TO THESE
 LINES. WPB AMEND. TO FBC SEC. 107.2.1.
 14) SHOW THE GAS SHUTOFF VALVES ON THE GAS RISER FOR
 THE APPLIANCES. 2017 FBC-RES. SEC. G2420.1.
 15) SHOW THE DISTANCE FROM OUTLET OF THE GAS REGULATORS
 TO THE APPLIANCES.WPB AMEND. TO FBC SEC. 107.2.1.
  
 **NOTE: I SUGGEST CONTACTING THIS PLAN REVIEWER TO SET
 AN APPOINTMENT TO GO OVEERR THESE COMMENTS BEFORE
 RESUBMITTING CORRECTIONS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved