Plan Review Notes
Plan Review Notes For Permit 18030768
Permit Number 18030768
Review Stop P
Sequence Number 1
Notes
Date Text
2018-03-30 13:29:3404/03/2018 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLUMBING RISER DIAGRAM REQUIRED WPB AMENDMENTS TO
 THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL PLUMBING
 2. HOT WATER HEATER RELIEF NEED TO DISCHARGE THROUGH AN
 AIR GAP LOCATED IN THE SAME ROOM AS THE WATER HEATER.
 FBC R 2804.6.1
 3. THE PAN DRAIN SHALL EXTEND FULL-SIZE AND TERMINATE
 OVER A SUITABLY LOCATED INDIRECT WASTE RECEPTOR OR
 SHALL EXTEND TO THE EXTERIOR OF THE BUILDING AND
 TERMINATE NOT LESS THAN 6 INCHES FBC R 2801.6.2
 4. WASHING MACHINE BOX SHALL BE ABLE TO BE SHUT OFF
 WITHOUT MOVING UNIT, PLEASE PROVIDE VALVES A LOCATION
 THAT CAN BE REACH FBC R 2903.9.3 FIXTURE VALVES AND
 ACCESS.
 5. ON P-1 HAS A NOTE THAT REFERS TO MIAMI-DADE CODE
 SECTION 8-31 MAXIMUM FLOW RATE WHICH IS NOT A ENFORCE
 SECTION BY THIS MUNICIPALITY, PLEASE DELETE AMENDED
 CONSTRUCTION DOCUMENTS FBC WPB A 107.4
 6. WATER HEATER E.F AT 0.91 NEW CODE REQUIRES .095 AS
 PER NECA APRIL 15 2015
 7. THE VALUE IS TO LOW, IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. WPB
 AMENDMENTS TO THE FBC 109.3 BUILDING PERMIT VALUATIONS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved