| 2018-05-17 16:08:23 | 05/17/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS NOTE |
| | - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME |
| | AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED |
| | UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. IT APPEARS THAT THERE ARE A GAS STOVE AND WATER |
| | HEATER PLEASE LIST THE BTU LOAD OF EACH APPLIANCE AND |
| | THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC |
| | FUEL GAS RES. SEC. G2413. |
| | 2. YOU ARE MISSING THE FIREPLACE IN THE BTU 7. INDICATE |
| | THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON THE PLAN |
| | PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. SEC. |
| | G2413.2. |
| | 3. THE PLAN REVIEW INDICATES AN EXISTING GAS APPLIANCE. |
| | THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED |
| | TO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE |
| | EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE |
| | EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| | OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM |
| | THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD |
| | OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO |
| | EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH |
| | OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES |
| | 2017 FBC FUEL GAS RES. SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3 |
| | 4. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL |
| | GAS RES. SEC. G2413.2 AND G2404.3 |
| | 5. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | (CLOTHES DRYERS, GAS HEATER, AND STOVE) 2017 FBC FUEL |
| | GAS RES. SEC. G2407.1 AND G2439.4. |
| | 6. INDICATE ON THE PLAN IF THE GRILL IS LOCATED UNDER A |
| | ROOF. WPB AMEND. TO FBC SEC. 107.2.1 |
| | 7. VALUE* JOB VALVE SEEM LOW, PROVIDED BONA FIDE SIGN |
| | CONTRACT. WPB AMEND TO THE FBC 109.3 BUILDING PERMIT |
| | VALUATIONS. IF IN THE OPINION OF THE BUILDING OFFICIAL, |
| | THE CLAIMED VALUATION OF BUILDING, ALTERATION, |
| | STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR PLUMBING |
| | SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONA CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | [email protected] |
| | 561-805-6720 |
| | |