| 2018-04-10 16:13:21 | 1ST REVIEW FBC-2017 MECHANICAL, EXISTING BUILDING, |
| | ENERGY CONSERVATION CODES |
| | PERMIT #18021224 |
| | 4/10/2018 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| | NEW AND RELOCATED AC SYSTEMS- SECTION C403.2.1 FBC-17 |
| | ENERGY CONSERVATION. PLEASE NOTE THAT BECAUSE THIS IS A |
| | CHANGE OF OCCUPANCY WITH NEW HEAT PRODUCING BREWERY |
| | EQUIPMENT, IT IS NECESSARY TO PROVIDE NEW HEAT LOAD |
| | CALCS TO VERIFY SYSTEM SIZING. |
| | |
| | 2) M-1: PROVIDE AN UP-TO-DATE SURVEY THAT INDICATES THE |
| | PROPERTY LINE OR RIGHT OF WAY ON THE WEST SIDE OF THE |
| | BUILDING THE M-1 PLAN SHOWS THE AC CONDENSERS, THE |
| | CHILLER, AND THE O/A INTAKES ON THAT SIDE OF THE |
| | BUILDING. PLEASE NOTE THAT O/A INTAKES SHALL BE LOCATED |
| | NOT LESS THAN 10' FROM LOT LINES PER SECTION 401.4. |
| | |
| | 3) M-1 & M-2: INDICATE THE TYPE AND SIZE OF THE GLYCOL |
| | PIPING, THE TYPE AND THICKNESS OF THE PIPE INSULATIONS, |
| | AND THE SPACING OF THE PIPE SUPPORT STANDS. |
| | |
| | 4) M-2: PROVIDE AN EQUIPMENT SCHEDULE FOR THE CHILLER |
| | AND SUBMIT MANUFACTURER'S SPECIFICATIONS. |
| | |
| | 5) M-2: PROVIDE THE OUTSIDE AIR CFMS FOR AHU-2 & 3 IN |
| | THE EQUIPMENT SCHEDULE. |
| | |
| | 6) M-1 & M-2: PROVIDE THE WIND DESIGN CRITERIA USED TO |
| | DETERMINE THE PRESSURES AND ANCHORING AND FASTENING |
| | METHODS FOR ALL OF THE EXTERIOR MECHANICAL EQUIPMENT |
| | AND COMPONENTS- SECTION 301.15 |
| | |
| | 7) M-1: PROVIDE COMBUSTION AIR CALCULATIONS FOR THE |
| | BREWHOUSE TANK- SECTION 304 FBC-17 FUEL GAS. |
| | |
| | 8) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE BREWERY TANKS WITH |
| | APPROVAL STAMPS BY THE DESIGNER OF RECORD. REFER TO |
| | SECTION1003.1 FBC-17 MECHANICAL: IF THE TANKS ARE |
| | DETERMINED TO BE CLASSIFIED AS PRESSURE VESSELS, THEY |
| | SHALL BE CONSTRUCTED AND CERTIFIED IN ACCORDANCE WITH |
| | ASME BOILER AND PRESSURE VESSEL CODE. |
| | |
| | 9) IDENTIFY AND LABEL ALL THE BREWERY TANKS AND |
| | EQUIPMENT SHOWN ON THE PLAN PROVIDE A PROCESS PIPING |
| | PLAN AND ISOMETRIC DRAWING. |
| | |
| | 10) THE PROPOSED OCCUPANCY SHALL BE IN COMPLIANCE WITH |
| | SECTION C505.1 FBC-17 ENERGY CONSERVATIONS. PLEASE |
| | PROVIDE A COMPLIANCE REPORT AS REQUIRED BY SECTION |
| | C101.5. |
| | |
| | 11) PROVIDE A FLORIDA PRODUCT APPROVAL OR MIAMI-DADE |
| | NOA FOR THE O/A LOUVERS- RULE 9N-3 FAC. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |