| Date |
Text |
| 2018-04-04 18:34:41 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC 107.3.5.3 - PROVIDE WIND DESIGN CRITERIA. |
| | SPECIFY THE COMPONENT AND CLADDING DESIGN PRESSURES |
| | PURSUANT TO FBC-R301.2.1 SPECIFY THE ROOF SHEATHING |
| | FASTENING PER FBC-R803.2.3.1 (SPECIFY THE CODE EDITION |
| | AND THE LEVEL OF ALTERATION FOR THE ADDITION ON THE |
| | PLANS.) |
| | |
| | 2) FBC ENERGY CONSERVATION - SECT. R103.1.1.2 CODE |
| | COMPLIANCE CERTIFICATION. THE BUILDING'S OWNER, THE |
| | OWNER'S ARCHITECT, OR OTHER AUTHORIZED AGENT LEGALLY |
| | DESIGNATED BY THE OWNER SHALL CERTIFY THAT THE BUILDING |
| | IS IN COMPLIANCE WITH THE CODE, AS PER SECTION 553.907, |
| | FLORIDA STATUTES, PRIOR TO RECEIVING THE PERMIT TO |
| | BEGIN CONSTRUCTION OR RENOVATION. FBC ENERGY |
| | CONSERVATION SECTIONS R101.5.1.1.1 OR R101.5.1.1.2. |
| | SUBMIT TWO SETS OF ENERGY COMPLIANCE FORMS AS REQUIRED. |
| | (ONE SET IS REQUIRED FOR THE ADDITION TO THE EXISTING |
| | DWELLING AND ANOTHER SET IS REQUIRED FOR THE NEW |
| | STORAGE BUILDING.) |
| | |
| | 3) COMPLIED. |
| | |
| | 4) COMPLIED. NO HEATING OR COOLING WAS SPECIFIED FOR |
| | THE NEW STORAGE STRUCTURE, WHICH SHALL NOT BE USED AS |
| | HABITABLE SPACE. |
| | |
| | 5) COMPLIED. |
| | |
| | 6) COMPLIED. |
| | |
| | 7) PROVIDE STRUCTURAL CONSTRUCTION DETAILS FOR THE |
| | PARAPETS ON THE PLANS. FBC-R301.1 |
| | |
| | 8) PROVIDE STRUCTURAL CONSTRUCTION DETAILS FOR THE |
| | BEAMS AT THE PROPOSED COVERED PORCH ON THE PLANS. |
| | FBC-R301.1 |
| | |
| | 9) PROVIDE STRUCTURAL DETAILS FOR THE WALL LEDGERS FOR |
| | THE ROOF RAFTERS AT THE PROPOSED PORCH AND MASTER |
| | BEDROOM ADDITION. FBC-R301.1 |
| | |
| | 10) SPECIFY THE STRUCTURAL CONNECTORS THAT WILL BE USED |
| | TO ANCHOR THE ROOF RAFTERS FOR THE ADDITION AND THE NEW |
| | CABANA BUILDING. PROVIDE A ROOF CONNECTOR SCHEDULE ON |
| | THE PLANS. FBC-R301.1 |
| | |
| | 11) PROVIDE WINDOW AND DOOR BUCK DETAILS ON THE PLANS. |
| | FBC-R609.7.2.1 |
| | |
| | 12) SPECIFY THE SIZES OF THE ROOF SCUPPERS ON THE PLANS |
| | AND PROVIDE ROOF SCUPPER SIZING CALCULATIONS. |
| | FBC-R903.4 & FBC 107.2.1.3 |
| | |
| | 13) SPECIFY THE SIZE AND LOCATION OF THE OVERFLOW |
| | SCUPPERS ON THE PLANS. FBC-R903.4 |
| | |
| | 14) SHOW COMPLIANCE WITH FBC-R318.5 FOR SCUPPER |
| | COLLECTORS AND DOWNSPOUTS THAT DISCHAGE AT LEAST ONE |
| | FOOT FROM THE STRUCTURE WALLS. |
| | |
| | 15) SHOW THE DOOR AND WINDOW LINTELS AND PROVIDE A |
| | LINTEL SCHEDULE ON THE PLANS. PROVIDE A DROP BEAM |
| | DETAIL FOR THE POURED TIE BEAM IF THIS METHOD IS USED |
| | RATHER THAN LINTELS. FBC-R606.10 |
| | |
| | 16) COMPLIED. |
| | |
| | 17) COMPLIED. |
| | |
| | 18) COMPLIED. |
| | |
| | 19) COMPLIED. |
| | |
| | 20) COMPLIED. |
| | |
| | 21) SPECIFY THE SIZE AND LOCATIONS OF THE WATER HEATERS |
| | FOR BOTH THE MAIN HOUSE AND THE STORAGE BUILDING ON THE |
| | PLANS. FBC-R306.4 |
| | |
| | 22) IN ORDER TO VERIFY THE VALUATION OF THIS PROJECT, |
| | PROVIDE A COPY OF THE SIGNED CONTRACT. FBC 109.3 |
| | BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES, |
| | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC, |
| | PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE |
| | WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. THE |
| | CONTRACT THAT WAS SUBMITTED INCLUDES A POOL AND SPA |
| | THAT REQUIRES A SEPARATE PERMIT. PROVIDE THE VALUE OF |
| | THE POOL AND SPA, SO THAT IT CAN BE DEDUCTED FROM THE |
| | CONTRACT VALUE. |
| | |
| | 23) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT |
| | A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| | COMMENTS HAS BEEN ADDRESSED. NOTE: DUE TO THE |
| | INFORMATION THAT IS MISSING FROM THE CONSTRUCTION |
| | DOCUMENTS ADDITIONAL COMMENTS MAY RESULT. |
| | |
| | |
| | |