| Plan Review Notes For Permit 18020428 |
| Permit Number |
18020428 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2018-02-22 17:58:47 | RESIDENTIAL (R3) ALTERATION, THIRD BUILDING REVIEW | | | CHECKLIST. | | | CODE: FBC 6TH EDITION (2017). | | | | | | 1- ACCORDING TO ENGINEER CALCULATIONS SUBMITTED THE | | | DESIGN PRESSURES SHOWN IN THE INSTALLATION SCHEDULE | | | SEEM TO BE TOO LOW FOR A BUILDING LOCATED IN EXPOSURE C | | | IF THE OPENINGS ARE LOCATED IN AND END ZONE OF 10 FT | | | AND A MEAN ROOF HEIGHT OF 27FT. ENGINEER TO REVISE | | | DESIGN PRESSURES AS REQUIRED. SEC. R301.1 | | | FBC-RESIDENTIAL, 6TH EDITION (2017). | | | | | | 2- ENGINEER CALCULATIONS NEED THE FOLLOWING: | | | A) ORIGINAL SEAL AND SIGNATURE AS REQUIRED BY | | | 61G15-23.003 F.A.C. PLEASE SUBMIT ORIGINAL | | | CALCULATIONS, NOT VIA E-MAIL. | | | | | | B) CALCULATIONS NEED A TITLE BLOCK WITH ALL THE | | | ENGINEER'S INFORMATION AS REQUIRED BY 61G15-23.001(4) | | | F.A.C. | | | | | | 3- INSTALLATION SCHEDULE CALLS FOR NOTE #2 FOR TOP | | | CONNECTION "U". THE CORRECT NOTE TO REFERENCE IS NOTE | | | #3 NOT NOTE #2. REVISE/CLARIFY AS REQUIRED. SEC. | | | 107.2.1 CITY AMENDMENTS. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|