| 2018-04-26 11:41:03 | 2ND REVIEW: FBC 2017 6TH EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHT. A-1 THE NOTE ON THE PLUMBING RISER STATING THE |
| | PLUMBING LAYOUT WILL BE SUBMITTED AFTER THE |
| | INSTALLATION WILL NOT COMPLY IN ORDER FOR A PLUMBING |
| | PERMIT TO BE ISSUED A CODE COMPLIANT SANITARY ISOMETRIC |
| | SHALL BE SUBMITTED AND APPROVED. 107.3.5.3(12) |
| | |
| | 2. SHT. A-1 THE SANITARY ISOMETRIC PLEASE CORRECT THE |
| | FOLLOWING |
| | A) THE WASTE STACK FOR THE 2ND FLOOR MASTERBATH |
| | LAVATORY'S, TUB AND WASHING MACHINE SHALL CONNECT TO |
| | THE BUILDING DRAIN SEPARATELY FROM THE POWDER ROOM BATH |
| | WET VENT. |
| | B) THE WASHING MACHINE BRANCH DRAIN SHALL CONNECT TO |
| | THE WASTE STACK DOWN STREAM OF THE LAVATORY'S AND TUB. |
| | C) THE POWDER ROOM TOILET SHALL BE VENTED BY THE |
| | LAVATORY STACK BEFORE CONNECTING TO THE BUILDING DRAIN. |
| | PER FBC RES P3108.1 |
| | |
| | 3. SHT. A-1 PLACE NOTE ON PLAN SHUT OFF VALVES FOR THE |
| | STACKABLE WASHING MACHINE SHALL BE ACCESSIBLE. PER FBC |
| | PL P2903.9.3 |
| | |
| | 4. THE PLUMBING AND GENERAL CONTRACTORS WORKMENS COMP |
| | INS AND LIBILITY INS NEEDS TO BE UPDATED WITH THE CITY |
| | OF WPB BEFORE A PERMITS CAN BE ISSUED. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |