| Date |
Text |
| 2018-02-08 09:30:56 | RESIDENTIAL (R3) ALTERATION, BUILDING REVIEW COMMENTS. |
| | CODE: FBC 6TH EDITION (2017). |
| | |
| | 1- PROPOSED INSTALLATION IS NOT CLEAR. DRAWING #2 OF 10 |
| | OF FLORIDA PRODUCT APPROVAL FL12856-R6 SUBMITTED SHOWS |
| | AN "H" HEADER AND "F" TRACK CIRCLED AS THE PROPOSED |
| | INSTALLATION, WHILE DRAWING #3 OF 10 SHOWS "DIRECT |
| | MOUNT SECTION CIRCLED WITH NO "H" HEADER OR "F" TRACK |
| | INSTALLATION. REVISE AS REQUIRED TO MATCH TO VERIFY |
| | PROPOSED INSTALLATION. NOTE: CONNECTION TYPES ARE |
| | DIFFERENT FOR EACH DIFFERENT APPLICATION. THAT'S WHY IS |
| | IMPORTANT TO KNOW THE EXACT PROPOSED INSTALLATION. SEC. |
| | 107.2.1 CITY AMENDMENTS. |
| | |
| | 2- INSTALLATION SCHEDULE SPECIFIES CONCRETE BLOCK AS |
| | THE SUBSTRATE WHERE THE STORM PANELS ARE GOING TO BE |
| | INSTALLED. BUT, ANCHOR SCHEDULE ON SHEET #8 OF 10 OF |
| | FLORIDA PRODUCT APPROVAL SUBMITTED SHOWS ANCHOR |
| | SCHEDULE CIRCLED FOR CONCRETE SUBSTRATE. REVISE AS |
| | REQUIRED. NEED TO USE THE ANCHOR SCHEDULE FOR CONCRETE |
| | BLOCK AND REVISE ANCHOR TYPE, SPACING AND EDGE DISTANCE |
| | ACCORDINGLY. OR, PROVIDE PROOF THAT THE SUBSTRATE IS |
| | CONCRETE WITH THE STRENGTH REQUIRED BY THE CONCRETE |
| | ANCHOR SCHEDULE. SEC. 107.2.1 CITY AMENDMENTS. |
| | |
| | 3- CLARIFY WHY THE INSTALLATION SCHEDULE SUBMITTED |
| | INDICATES THAT SHUTTERS ARE GOING TO BE INSTALLED |
| | HORIZONTALLY IF BASED ON THE SHUTTER SPAN SHOWN, IT |
| | LOOKS LIKE THE PANELS ARE GOING TO BE INSTALLED |
| | VERTICALLY NOT HORIZONTALLY. REVISE AS REQUIRED. SEC. |
| | 107.2.1 CITY AMENDMENTS. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |