| 2018-03-08 06:08:58 | 03/08/2018 PLUMBING 1ST REVIEW**DENIED** |
| | |
| | 1) LISTED VALUE SEEMS LOW. 109.3 BUILDING PERMIT |
| | VALUATIONS. IF, IN THE OPINION OF THE BUILDING |
| | OFFICIAL, THE CLAIMED VALUATION OF |
| | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW |
| | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL. |
| | |
| | 2) ADDRESS REQUIRED TO BE ON PLAN FBC 107.2.1 |
| | |
| | 3) PLAN LIST INCORRECT CODE CYCLE. AS OF DEC,31,2017 WE |
| | ARE USING THE 2017 FBC 6TH ED. |
| | |
| | 4) PLUMBING ISOMETRIC IN THE MASTER BATHRROM IS DRY |
| | VENTED. PER FBC-P 912.2 ALL VENT MUST BE WASHED @ BASE |
| | OF STACK. FBC-P 912.2 |
| | |
| | 5) SHT M-1 SHOW COPPER RELIEF TO DISCHARGE OUTSIDE. PER |
| | FBC-R P2804.6.1 THE RELIEF MUST DISCHARGE INTO THE SAME |
| | ROOM THAT THE HEATER IS IN. |
| | |
| | 6) PLEASE SHOW THE REQUIRED HEATER PAN AND DISCHARGE |
| | LINE TO THE OUTSIDE. FBC-R P 2801.6 |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |