| 2018-06-14 16:49:49 | 06/14/2018 1ST GAS REVIEW**DENIED** |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | YOU ARE SHOWING SCOPE OF WORK NOTE #6 ADD GAS TANKLESS |
| | WATER HEATER. PLEASE ANSWER THE FOLLOWING COMMENTS |
| | |
| | 1) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC. |
| | G2413.4.1, G2413.4.2. |
| | |
| | 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING |
| | (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO |
| | FBC SEC.107.2.1. |
| | |
| | 3) TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| | G2413.4 (1 ) THROUGH G2413.4 (21). |
| | |
| | 5) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. |
| | SEC. G 2413.4.1, G2413.4.2. |
| | |
| | 6) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 |
| | FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES DRYERS) OR |
| | 2017 FBC-RES. SEC. G 2407.1 AND G2439.4 (CLOTHES |
| | DRYERS). |
| | |
| | 7) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 |
| | THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3. |
| | |
| | 8) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | 9) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| | THE ONLY GAS APPLIANCE ON THIS SYSTEM? IF NOT, SUBMIT A |
| | COMPLETE GAS RISER SHOWING ALL PIPE SIZES, TYPE OF |
| | PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET, |
| | THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM, |
| | THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM. |
| | THESE REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM. |
| | |
| | 10) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | 11) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED |
| | GAS APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL |
| | GAS SEC.304.9.3 OR FBCR G2407.9.3. |
| | |
| | 12) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL |
| | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) |
| | THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8, |
| | G2413.1, G2413.2, & G2413.3. |
| | |
| | 13) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS |
| | SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4. |
| | |
| | 14) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| | SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| | |
| | 15) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC. |
| | G2421.1. |
| | |
| | 16) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 |
| | OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE |
| | PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |
| | |
| | |