| 2018-02-12 14:08:58 | 1ST REVIEW: FBC 2017 6TH EDITION |
| | |
| | GAS COMMENTS: |
| | |
| | 1. THE BTU LOAD ON THE APPLIANCES DO NOT ADD UP OR |
| | MATCH THE TOTAL BTU LOADS ON THE RISER PIPING PLEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 2. SOME OF THE LABELING ON THE RISER IS SHOWN AS |
| | EXISTING OTHER SECTIONS ARE NOT PLEASE CLARIFY. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 3. ONE OF THE LABELS ON THE RISER NEXT TO THE EMERGENCY |
| | SHUT OFF LIST 21' @3/4(75K) BUT NO PIPING IS SHOWN |
| | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 4. THE WATER HEATER IS SHOWN ON THE RISER WITH 180K BTU |
| | BUT ON THE GAS CALCULATIONS-IT IS SHOWN AS 75K PLEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 5. 2 STOCK POTS ARE SHOWN ON THE RISER BUT 3 ARE LISTED |
| | ON THE GAS CALC PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 6. THE TOTAL BTU LOAD ON THE GAS CALC IS 713 ON THE |
| | RISER IT ADDS UP TO 743 PLEASE CLARIFY. PER WPB AMEND |
| | TO FBC 107.2.1 |
| | |
| | 7. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-2014 FUEL GAS CODE SEC. 304. |
| | |
| | 8. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |