2018-05-12 08:30:131) THE GAS DRAWING REFERS TO THE 2014 FBC. THE CODE IN
 EFFECT FOR THIS GAS PERMIT IS THE 2017 FBC BECAUSE
 THESE APPLIANCES WERE SHOWN ON THE ORIGINAL PLANS AS
 ELECTRIC.REVISE THE NOTE ON THE PLAN.
 2) THE COPIES OF THE GAS SIZING TABLES ARE FROM THE
 2014 FBC. THE CODE IN EFFECT FOR THIS PERMIT IS THE
 2017 FBC. SUBMIT TWO COPIES OF EACH APPLICABLE SIZING
 TABLE BEING USED IN THE DESIGN OF THIS GAS SYSTEM. WPB
 AMEND. TO FBC SEC. 107.1.
 3) SUBMIT TWO COPIES OF PAGE 30 FROM THE NAVIEN
 INSTALLATION MANUAL THAT SHOWS THE REQUIRED LOCATION
 AND CLEARANCES OF THE TANKLESS WATER HEATER. WPB AMEND.
 TO FBC SEC. 107.1.
 4) SHOW THE LOCATION OF THE GAS METERS, THE TANKLESS
 WATER HEATERS AND THE INLET AND OUTLET VENTS ON SHT.
 S-1. THE LOCATION OF THE TANKLESS WATER HEATERS AND
 VENTS SHALL COMPLY WITH THE INSTALLATION MANUAL.
 5) THE SUBMITTED RESPONSE NARRATIVE STATES THAT A
 TANKLESS WATER HEATER WILL BE INSTALLED ON THE EXTERIOR
 OF THE BUILDING YET SHT. S-1 SHOWS A TANK TYPE WATER
 HEATER IN THE GARAGE AS CROSSED-OUT WITH AN "X" BUT
 WITH A HANDWRITTEN NOTE STATING "WATER HEATER IN
 GARAGE." IS THE TANK TYPE HEATER IN THE GARAGE BEING
 DELETED OR REMAINIING? THE RESPONSE NARRATIVE STATES "
 WILL WHITE OUT ON SET OF PLANS" BUT NOTHING HAS BEEN
 DONE. CLARIFY.
 6) THE SURROUNDING AREAS ON THE SECOND FLOOR CANNOT BE
 USED FOR SUPPLYING COMBUSTION AIR FOR THE DRYER UNLESS
 LOUVERS ARE INSTALLED IN THESE ROOMS BECAUSE THERE ARE
 DOORS ON THESE ROOMS.THE COMMUNICATING SPACE(S) MUST BE
 OPEN IN ORDER TO BE USED TO COMPLY WITH SEC.G2407.5.
 SUBMIT INFORMATION AS TO HOW COMBUSTION AIR WILL BE
 SUPPLIED FOR THE DRYER. COMPLY WITH 2017 FBCR
 SEC.G2439.5.
 7) INDICATE ON THE PLAN IF THE LAUNDRY ROOM LOUVERED
 BI-FOLD DOORS ARE METAL OR WOOD AND NOTE THE TOTAL
 SQUARE INCH AREA OF EACH OF THE LOUVERS ON EACH DOOR.
 THE NET FREE AREA FOR METAL LOUVERS SHALL BE ASSUMED TO
 BE 75% AND 25% FOR WOOD LOUVERS PER 2017 FBCR
 SEC.G2407.10.
 8) SHOW THE LOCATION OF THE UNDERGROUND PE GAS LINE GAS
 ON SHT. S-1.
 9) THE GAS PIPING RISER NOTES THAT THE GAS SYSTEM IS
 FOR A 12 INCH WATER COLUMN PRESSURE YET YOU HAVE
 SUBMITTED A GAS SIZING TABLE FOR PE PIPE AT A 2 PSI
 PRESSURE. CLARIFY AND SUBMIT A COPIES OF THE CORRECT
 SIZING TABLES FOR REVIEW. 2017 FBCR SEC. G2413.
 10) IF THIS IS A 12 INCH WATER COLUMN SYSTEM, WHY ARE
 REGULATORS BEING INSTALLED? ALSO, THESE ARE SERVICE
 REGULATORS AND ARE USUALLY INSTALLED BY THE GAS
 SUPPLIER TO REDUCE AND LIMIT THE SERVICE LINE PRESSURE
 TO DELIVERY PRESSURE. CLARIFY THE USE OF THESE
 REGULATORS.WPB AMEND TO FBC SEC. 107.2.1, 2017 FBCR
 SEC.G2403 (DEFINITIONS).
 11) THE SUBMITTED GAS SIZING TABLES FOR THE SCH. 40
 METALLIC PIPE AND CSST ARE FOR A PRESSURE DROP OF 0.5
 IN. W.C. BUT THE GAS PIPING RISER REFERENCES TABLES
 402.4 (4) AND 402.4 (17) WHICH IS FOR A PRESSURE DROP
 OF 6.0 IN. W.C. CLARIFY.
 12) THE SUBMITTED GAS SIZING TABLE FOR THE PE PIPE IS
 FOR A 2 PSI SYSTEM BUT THE SIZING TABLE REFERENCED ON
 THE PLAN IS 402.4 (21) WHICH IS FOR A SYSTEM LESS THAN
 2 PSI WITH A PRESSURE DROP OF 0.5 IN. W.C. CLARIFY.
 13) SHOW THE PIPE SIZE OF THE SCH. 40 METALLIC PIPE TO
 THE TANKLESS WATER HEATER AND ALSO TO THE RANGE ON BOTH
 GAS PIPING RISERS. IF THIS IS LESS THAN A 2 PSI SYSTEM,
 THE PIPE SIZE TO THE TANKLESS WATER HEATER SHALL BE A
 MINIMUM OF 1 INCH AND THE PIPE SIZE TO THE RANGE SHALL
 BE A MINIMUM OF 3/4 INCH.
 14) THE SIZE OF THE SCH. 40 METALLIC PIPE ON THE POINT
 OF DELIVERY FROM THE METER ( OUTLET OF THE METER) SHALL
 BE A MINIMUM OF 1 INCH PER TABLE G2413.4 (1) OF 2017
 FBCR. THE MAXIMUM BTU LOAD OF A 1 INCH PIPE AT 40 FEET
 FOR A LESS THAN 2 PSI SSYSTEM WITH A 0.5 IN. W.C.
 PRESSURE DROP IS 320,000 BTU'S AND THE SYSTEM IS
 SHOWING A TOTAL LOAD OF 331,000 BTU'S. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved