| Date |
Text |
| 2018-03-29 12:06:17 | 03/29/2018 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. HOT WATER HEATER DRAIN PAN REQUIRED IN THE DWELLING |
| | AT LOCATION WHERE WATER LEAKAGE FROM THE TANK WILL |
| | CAUSE DAMAGE FBC R 2801.6 REQUIRED PAN. |
| | 2. THE PAN DRAIN SHALL EXTEND FULL-SIZE AND TERMINATE |
| | OVER A SUITABLY LOCATED INDIRECT WASTE RECEPTOR OR |
| | SHALL EXTEND TO THE EXTERIOR OF THE BUILDING AND |
| | TERMINATE NOT LESS THAN 6 INCHES FBC R P2801.6.2 PAN |
| | DRAIN TERMINATION. |
| | 3. THERMAL EXPANSION DEVICE FOR CONTROLLING INCREASED |
| | PRESSURE CAUSED BY THERMAL EXPANSION SHALL BE INSTALLED |
| | WHERE REQUIRED IN ACCORDANCE WITH SECTIONS FBC R |
| | 2903.4.1. |
| | 4. WATER HEATER SHOWN ON PAGES A102 AND A103 AS A |
| | SINGLE UNIT BUT ON E101 AND P101 IT SHOWS TWO UNITS, |
| | PLEASE LABEL AND CLARIFY IF TWO UNITS ARE TO BE USED. |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | [email protected] |
| | 561-805-6720 |
| | |