Plan Review Notes
Plan Review Notes For Permit 17121069
Permit Number 17121069
Review Stop G
Sequence Number 2
Notes
Date Text
2018-05-02 08:25:402ND REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
 PREVIOUS COMMENT NOT COMPLIED 6. SUBMIT MANUFACTURER?S
 SPECIFICATION SHEETS FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS SEC. 402.2 YOUR RESPONSE LETTER
 STATES THE MANUFACTURE SPECIFICATION ARE ATTACHED TO
 THE SUBMITTAL THEY ARE NOT IN THE SUBMITTAL PACKAGE
 PLEASE SUBMIT WE WILL HAVE TO HAVE THEM TO VERIFY CODE
 COMPLIANCE AND BTU LOAD.\
  
 NEW COMMENT:
  
 1. THE BTU LOAD FOR THE GRIDDLE IS SHOWN AT 105
 ON THE RISER AND 60 ON THE GAS LOAD CALCULATION PLEASE
 CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 2. THE BTU LOAD ON THE MANIFOLD ON THE RISER 7' @ 11/2
 788K PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved