| 2018-05-03 19:22:01 | BUILDING REVIEW COMMENTS |
| | CODE: FBC 5TH EDITION (2014). |
| | |
| | 1- BEFORE A PERMIT TO CONSTRUCT CAN BE ISSUED, IMPACT |
| | FEES MUST BE PAID TO PALM BEACH COUNTY. UPON APPROVAL, |
| | ONE SET OF PLANS SHALL BE SIGNED OUT AND SUBMITTED TO |
| | PALM BEACH COUNTY FOR AN IMPACT FEE REVIEW. THE PLANS |
| | WITH THE IMPACT FEE STAMP AND A COPY OF THE PAID |
| | RECEIPT MUST BE RETURNED TO THE CITY BUILDING |
| | DEPARTMENT BEFORE THE BUILDING PERMIT CAN BE ISSUED. |
| | FOR INFORMATION CALL PALM BEACH COUNTY IMPACT FEES AT |
| | (561) 233-5025. |
| | |
| | 2- ENERGY CALCULATIONS SUBMITTED: |
| | A) FORM C402-2014 SUBMITTED NEED TO BE CERTIFIED AT THE |
| | BOTTOM AS REQUIRED BY SEC. C103.1.1.2 FBC-ENERGY |
| | CONSERVATION PRIOR TO RECEIVE THE PERMIT. |
| | |
| | C103.1.1.2 CODE COMPLIANCE CERTIFICATION. |
| | THE BUILDING'S OWNER, THE OWNER'S ARCHITECT, OR OTHER |
| | AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL |
| | CERTIFY THAT THE BUILDING IS IN COMPLIANCE WITH THE |
| | CODE, AS PER SECTION 553.907, FLORIDA STATUTES, PRIOR |
| | TO RECEIVING THE PERMIT TO BEGIN CONSTRUCTION OR |
| | RENOVATION. |
| | |
| | B) PROVIDE COMPLETE AND CORRECT INFORMATION ON TOP OF |
| | FORM: (1) CLIMATE ZONE IS 1A NOT 8.. SEE SEC. C301.1 |
| | FBC-ENERGY CONSERVATION. (2) SPECIFY THE PERMITTING |
| | OFFICE. (3) THE COMPLETE PROJECT NAME IS THE YELLOW |
| | DOOR RESTAURANT. (4) PROVIDE THE NAME OF THE BUILDER. |
| | SEC. C103.3 FBC-ENERGY CONSERVATION. |
| | |
| | 3- REPEAT COMMENT. VALUATION DECLARED IN THE PERMIT |
| | APPLICATION IS TOO LOW. REVISE AS REQUIRED. |
| | |
| | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 4- THE PROPOSED ALTERATION IS A CHANGE IN OCCUPANCY |
| | WITH NO CHANGE OF OCCUPANCY CLASSIFICATION. A |
| | CERTIFICATE OF OCCUPANCY SHALL BE ISSUED BEFORE |
| | OPERATION AS REQUIRED BY SEC. 1001.2 FBC-EXISTING |
| | BUILDING. |
| | |
| | SEC. 1001.2 CHANGE IN OCCUPANCY WITH NO CHANGE OF |
| | OCCUPANCY CLASSIFICATION. |
| | A CHANGE IN OCCUPANCY, AS DEFINED IN SECTION 202, WITH |
| | NO CHANGE OF OCCUPANCY CLASSIFICATION SHALL NOT BE MADE |
| | TO ANY STRUCTURE THAT WILL SUBJECT THE STRUCTURE TO ANY |
| | SPECIAL PROVISIONS OF THE APPLICABLE FLORIDA BUILDING |
| | CODES, INCLUDING THE PROVISIONS OF SECTIONS 1002 |
| | THROUGH 1011, WITHOUT THE APPROVAL OF THE CODE |
| | OFFICIAL. A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED |
| | WHERE IT HAS BEEN DETERMINED THAT THE REQUIREMENTS FOR |
| | THE CHANGE IN OCCUPANCY HAVE BEEN MET. |
| | |
| | |
| | |
| | ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO HELP EXPEDITE THE REVIEW PROCESS. |
| | |
| | ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| | DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY |
| | REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |