| 2018-10-18 16:33:30 | 3RD REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17121030 |
| | 10/18/18 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | SOME OF THE COMMENTS FROM THE 1ST AND 2ND REVIEW HAVE |
| | NOT BEEN ADDRESSED COMPLETELY AND STILL EXIST. I HAVE |
| | REPRINTED THOSE COMMENTS BELOW, HOWEVER THE NUMERICAL |
| | AND ALPHABETICAL ORDERS HAVE CHANGED. OTHER COMMENTS |
| | THAT HAVE BEEN ADDRESSED HAVE BEEN DELETED. IN ORDER TO |
| | EXPEDITE REVIEW OF THE RESUBMITTED PLANS, PLEASE |
| | PROVIDE A RESPONSE NARRATIVE ADDRESSING EACH REMAINING |
| | AND EACH NEW COMMENT. |
| | |
| | 1) THE MINIMUM VENTILATION CALCULATIONS FOR EXHAUST |
| | SYSTEMS WERE NOT PROVIDED. THERE IS A NEW EXHAUST FAN |
| | (EF-A) IN THE BREW TANK ROOM. PLEASE PROVIDE THE SIZING |
| | CALCULATIONS AND THE SEQUENCE OF OPERATION FOR THE FAN. |
| | |
| | 2) THE REQUESTED CUT SHEET FOR THE NEW CHILLER WAS NOT |
| | PROVIDED- PLEASE PROVIDE. |
| | |
| | 3) CUT SHEETS FOR THE BREW TANKS HAVE BEEN PROVIDED |
| | EACH INDICATING THAT THEY ARE PRESSURE VESSELS AND |
| | WOULD REQUIRE CERTIFICATION IN ACCORDANCE WITH THE ASME |
| | BOILER AND PRESSURE VESSEL CODE. THE CUT SHEETS DO NOT |
| | INDICATE THE TANKS HAVE THAT CERTIFICATION. PLEASE NOTE |
| | THAT HOT TANKS D AND E DO NOT LIST THE WORKING |
| | PRESSURES. |
| | |
| | 4) THE REQUESTED WIND LOAD ENGINEERING FOR THE CHILLER |
| | WAS NOT PROVIDED. THE NEW NOTE ON S-2 INDICATES IT WILL |
| | BE DONE UNDER A SEPARATE PERMIT WHICH IS NOT |
| | ACCEPTABLE. PLEASE PROVIDE THE ENGINEERING OR REQUEST |
| | IT TO BE A DEFERRED SUBMITTAL. |
| | |
| | 5) WORKING CLEARANCES AND ANCHORING DETAILS FOR THE |
| | BREW TANKS NOT PROVIDED. |
| | |
| | 6) PROVIDE THE CLEARANCE DISTANCE FOR THE COMBUSTION |
| | AIR OPENING TO THE PROPERTY LINE, AND SUBMIT MIAMI-DADE |
| | NOA # 16-0201.08. PLEASE NOTE FL. PRODUCT APPROVAL |
| | #12941.1 IS NOT VALID FOR 2017. |
| | |
| | 7) M-1: THE SUBMITTED MANUFACTURER SPECIFICATIONS FOR |
| | THE POWER FLAME EQUIPMENT BURNERS INDICATE THEY ARE TO |
| | BE ATTACHED IN SOME MANNER TO THE HOT LIQUOR AND BREW |
| | HOUSE TANKS EITHER DIRECTLY OR VIA A HEAT EXCHANGER. |
| | PLEASE PROVIDE A DETAIL SHOWING HOW THIS ATTACHMENT |
| | WILL BE MADE, AND HOW BY-PRODUCTS OF COMBUSTION WILL BE |
| | VENTED FROM THE TANKS OR THE EXHANGERS. THERE IS AN 8" |
| | VENT INDICATED FOR THE BREW HOUSE (E) ON SHEET M-2 |
| | HOWEVER NO INFORMATION ON VENT SIZNG, VENT TYPE, OR |
| | VENT RUN WAS PROVIDED EITHER IN THE SPECS OR ON THE |
| | PLAN AS PREVIOOUSLY REQUESTED. PLEASE NOTE THAT NO VENT |
| | IS SHOWN FOR THE HOT LIQUOR TANK (D). PROVIDE A VENTING |
| | DIAGRAM THAT PROVIDES THE REQUESTED MISSING INFORMATION |
| | AND SUBMIT CUT SHEETS FOR THE VENT PIPE AND TERMINATION |
| | CAP- SEE SECTIONS 502, 503, AND 504 FBC FG. |
| | |
| | 8) REFER TO SECTION 619.1 FBC FG AND VERIFY THAT THE |
| | POWER FLAME BURNERS CONFORM TO ANSI Z21.8. |
| | |
| | 9) THERE IS A DISCREPANCY IN THE PLANS AND THE SPECS ON |
| | THE REQUIRED COMBUSTION AIR OPENING SIZING FOR THE |
| | POWER FLAME BURNERS. THE PLANS INDICATE 1 SQ. INCH PER |
| | 3000 BTU/H, HOWEVER THE SPECS INDICATE 1/2 SQ. INCH PER |
| | 1000 BTU/H. PROVIDE THE CORRECT CALCULATION AND OPENING |
| | SIZE PER THE MANUFACTURER'S SPECS. ADDITIONALLY PLEASE |
| | REFER TO SECTION 304.6.2 FBC FG FOR THE REQUIRED |
| | LOCATION OF THE OPENING TO COMMENCE WITHIN 12 INCHES OF |
| | THE TOP OF THE ENCLOSURE. |
| | |
| | 10) SHEET M-2: IT IS NOT CLEAR IF AIR FROM THE NEW |
| | ENCLOSED BREWERY ROOM WILL BE RECIRCULATED TO THE |
| | OCCUPIED DINING AREAS, HOWEVER BASED ON TABLE 403.3.1.1 |
| | RECIRCULATION OF AIR FROM KITCHEN COOKING AREAS IS |
| | PROHIBITIED, AND ALTHOUGH BREWERY AREAS ARE NOT LISTED |
| | IN THE TABLE, THE KITCHEN OCCUPANCY WOULD BE THE MOST |
| | SIMILAR- SEE SECTION 404.3.1.1 FOR AN EXPALNATION OF |
| | THIS. |
| | |
| | 11) IN ACCORDANCE WITH SECTIONS 107.1 AND 107.2 WPB ALL |
| | EQUIPMENT AND APPLIANCE SUBMITTALS INCLUDING THE |
| | CHILLER AND BREW TANKS SHALL BEAR THE SHOP DRAWING |
| | STAMP OF THE EOR. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |