2018-02-22 11:05:532ND REVIEW FBC-2014 MECHANICAL
 PERMIT #17121030
 2/22/18
  
 PLAN REVIEW RESULTS: DENIED.
  
  
 1) MANY OF THE COMMENTS FROM THE 1ST REVIEW HAVE NOT
 BEEN ADDRESSED AND STILL EXIST. I HAVE REPRINTED THOSE
 COMMENTS BELOW. OTHER COMMENTS THAT HAVE BEEN ADDRESSED
 HAVE BEEN DELETED. IN ORDER TO EXPEDITE REVIEW OF THE
 RESUBMITTED PLANS, PLEASE PROVIDE A RESPONSE NARRATIVE
 ADDRESSING EACH REMAINING AND EACH NEW COMMENT. PLEASE
 PROVIDE:
  
 A) COMPLETE DUCT LAYOUT DRAWINGS THAT SHOW ALL NEW AND
 RELOCATED DUCTS, DIFFUSERS, GRILLS, FIRE DAMPERS, DUCT
 SMOKE DETECTORS ETC. (SECOND FLOOR PLAN HAS BEEN
 SUBMITTED NO PLAN SUBMITTED FOR THE FIRST FLOOR).
  
 B) AIR DEVICE SCHEDULE
  
 C) DUCT HANGING, CONNECTION, AND SUPPORT DETAILS
  
 B) MINIMUM VENTILATION CALCULATIONS FOR ALL ROOMS AND
 SPACES. (IT IS NOT CLEAR IF ADEQUATE O/A IS BEING
 PROVIDED TO THE ALTERED ROOMS AND SPACES.
  
 D) MINIMUM VENTILATION CALCULATIONS FOR EXHAUST SYSTEMS
  
 G) EQUIPMENT SCHEDULES AND CUT SHEETS FOR THE BREW
 TANKS, CHILLER, BOILER, FLUE VENTS, REFRIGERATION,
 APPLIANCES ETC.
  
 I) WORKING CLEARANCES FOR EQUIPMENT AND ACCESS FOR
 SERVICE AND REPLACEMENT.
  
 J) EQUIPMENT ANCHORING DETAILS
  
 K) WIND LOAD ENGINEERING FOR ALL EXTERIOR MOUNTED
 APPLIANCES AND EQUIPMENT.
  
 L) OUTDOOR AIR INLET AND EXHAUST OUTLET LOCATIONS,
 CLEARANCES AND OPENING PROTECTIONS.
  
 2) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN
 HOODS, FIRE SUPPRESSION, AND WALK-IN COOLERS AND
 FREEZERS. PLEASE PLACE NOTES ON THE PLAN ACCORDINGLY.
  
 3) SHEET M-1: SHOW THE LOCATION OF THE BOILER AND
 SUBMIT MANUFACTURER'S SPECIFICATIONS PER SECTION 631
 FBC-14 FUEL GAS.THE NEW COMBUSTION AIR OPENING APPEARS
 TO BE LOCATED BY THE BREW TANKS, THE BOILER IS NOT
 SHOWN AND THERE IS NO EQUIPMENT SCHEDULE PROVIDED,
 PLEASE NOTE THAT THE BOILER MAY BE REQUIRED TO BE IN A
 FIRE-RATED ROOM PER TABLE 509 FBC-14 BUILDING.
  
 4) M-1: PROVIDE A VENTING PLAN FOR THE BOILER
 INDICATING THE TYPE AND SIZE OF FLUE PIPE, LENGTH OF
 THE VENT RUN, TERMINATION HEIGHT ABOVE THE ROOF, AND
 CLEARANCE DISTANCES TO GRAVITY AND MECHANICAL AIR
 INTAKES- SECTION 503 FBC-14 FUEL GAS
  
 5) M-1: SUBMIT MANUFACTURER SPECIFICATIONS FOR THE
 POWER FLAME EQUIPMENT BURNERS AND INDICATE WHAT
 FUNCTION THEY ARE PERFORMING IN THE BREWING PROCESS.
 BECASUE THESE BURNERS ARE ATTACHED TO TANKS, PLEASE
 PROVIDE THE WORKING PRESSURE OF THE TANKS, AND NOTE
 THAT PRESSURE VESSELS EXCEEDING 15 PSI SHALL BE IN
 ACCORDANCE WITH THE ASME BOILER AND PRESURE VESSEL
 CODE-
  
 SECTION 1003.1 FBC-14 MECHANICAL.
  
 6) M-1: INDICATE HOW COMBUSTION AIR IS BEING PROVIDED
 TO THE POWER FLAME UNITS AND PROVIDE CALCULATIONS PER
 SECTION 304 FBC-14 FUEL GAS.
  
 7) M-1: PROVIDE A VENTING PLAN FOR THE EQUIPMENT
 BURNERS INDICATING THE TYPE AND SIZE OF VENT PIPE,
 LENGTH OF THE VENT RUN, TERMINATION HEIGHT ABOVE THE
 ROOF OR FROM GRADE, AND CLEARANCE DISTANCES TO GRAVITY
 AND MECHANICAL AIR INTAKES- SECTION 503 FBC-14 FUEL
 GAS.
  
 8) M-1: PROVIDE A FLORIDA PRODUCT APPROVAL OR
 MIAMI-DADE NOA FOR THE NEW BOILER COMBUSTION AIR
 OPENING- RULE 9N-03 FLORIDA ADMINISTRATIVE CODE. REFER
 TO SECTIIO N 304.6.2 AND PROVIDE A NOTE OR ELEVATION
 DRAWING TO INDICATE THE LOCATION OF THE COMBUSTION AIR
 OPENING.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved