| Date |
Text |
| 2018-10-29 09:26:32 | |
| | 1) CUT SHEETS FOR THE BREW TANKS HAVE BEEN PROVIDED |
| | EACH INDICATING THAT THEY ARE PRESSURE VESSELS AND |
| | WOULD REQUIRE CERTIFICATION IN ACCORDANCE WITH THE ASME |
| | BOILER AND PRESSURE VESSEL CODE. THE CUT SHEETS DO NOT |
| | INDICATE THE TANKS HAVE THAT CERTIFICATION. PLEASE NOTE |
| | THAT HOT TANKS D AND E DO NOT LIST THE WORKING |
| | PRESSURES. |
| | |
| | 2) PROVIDE THE CLEARANCE DISTANCE FOR THE COMBUSTION |
| | AIR OPENING TO THE PROPERTY LINE. |
| | |
| | 3) M-1: THE SUBMITTED MANUFACTURER SPECIFICATIONS FOR |
| | THE POWER FLAME EQUIPMENT BURNERS INDICATE THEY ARE TO |
| | BE ATTACHED IN SOME MANNER TO THE HOT LIQUOR AND BREW |
| | HOUSE TANKS EITHER DIRECTLY OR VIA A HEAT EXCHANGER. |
| | PLEASE PROVIDE A DETAIL SHOWING HOW THIS ATTACHMENT |
| | WILL BE MADE, AND HOW BY-PRODUCTS OF COMBUSTION WILL BE |
| | VENTED FROM THE TANKS OR THE EXHANGERS. THERE IS AN 8" |
| | VENT INDICATED FOR THE BREW HOUSE (E) ON SHEET M-2 |
| | HOWEVER NO INFORMATION ON VENT SIZNG, VENT TYPE, OR |
| | VENT RUN WAS PROVIDED EITHER IN THE SPECS OR ON THE |
| | PLAN AS PREVIOOUSLY REQUESTED. PLEASE NOTE THAT NO VENT |
| | IS SHOWN FOR THE HOT LIQUOR TANK (D). PROVIDE A VENTING |
| | DIAGRAM THAT PROVIDES THE REQUESTED MISSING INFORMATION |
| | AND SUBMIT CUT SHEETS FOR THE VENT PIPE AND TERMINATION |
| | CAP- SEE SECTIONS 502, 503, AND 504 FBC FG. GAS VENTS |
| | SHALL TERMINATE IN ACCORDANCE WITH 2014 FBC-FUEL GAS |
| | SEC. |
| | |
| | 4) REFER TO SECTION 619.1 FBC FG AND VERIFY THAT THE |
| | POWER FLAME BURNERS CONFORM TO ANSI Z21.8. |
| | |
| | 5) THERE IS A DISCREPANCY IN THE PLANS AND THE SPECS ON |
| | THE REQUIRED COMBUSTION AIR OPENING SIZING FOR THE |
| | POWER FLAME BURNERS. THE PLANS INDICATE 1 SQ. INCH PER |
| | 3000 BTU/H, HOWEVER THE SPECS INDICATE 1/2 SQ. INCH PER |
| | 1000 BTU/H. PROVIDE THE CORRECT CALCULATION AND OPENING |
| | SIZE PER THE MANUFACTURER'S SPECS. ADDITIONALLY PLEASE |
| | REFER TO SECTION 304.6.2 FBC FG FOR THE REQUIRED |
| | LOCATION OF THE OPENING TO COMMENCE WITHIN 12 INCHES OF |
| | THE TOP OF THE ENCLOSURE. |
| | |
| | 6) IN ACCORDANCE WITH SECTIONS 107.1 AND 107.2 WPB ALL |
| | EQUIPMENT AND APPLIANCE SUBMITTALS INCLUDING THE |
| | CHILLER AND BREW TANKS SHALL BEAR THE SHOP DRAWING |
| | STAMP OF THE EOR. |
| | |
| | 7) THE REGULATOR VENTS FOR THE POWER FLAME BURNERS |
| | SHALL BE PIPED TO THE EXTERIOR PER 2014 FBC-FUEL GAS |
| | SEC.410.3. SEE EXCEPTION FOR VENT-LIMITING DEVICE. |
| | |
| | 8) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE LINE |
| | PRESSURE REGULATORS FOR THE POWER FLAME BURNERS. FBC |
| | SEC. 107.2.1. |
| | |
| | 9) THERE IS ONLY ONE SHEET OF INFORMATION FOR TANK "E" |
| | AND IT IS JUST A PRODUCT SHEET. SUBMIT ADDITIONAL |
| | INFORMATION FOR THIS TANK.FBC 107.2.1. |
| | |
| | 10) SHOW THE DISTANCE FROM THE LINE PRESSURE REGULATORS |
| | TO THE POWER FLAME BURNERS. |
| | |
| | 11) COMPLETE PIPING PLANS SHALL BE PROVIDED FOR ALL THE |
| | TANKS. FBC 107.2.1. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |