| 2019-03-28 08:54:17 | 1ST REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17121018 |
| | 410 N. ROSEMARY |
| | 3/27/2019 |
| | |
| | CODES IN EFFECT: |
| | FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014 |
| | FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION |
| | 2014 |
| | FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2014 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES |
| | AND OMISSIONS LISTED NUMERICALLY BELOW. PLEASE REVIEW |
| | ALL COMMENTS, INCLUDING THOSE LISTED FOR ADVISORY |
| | PURPOSES, AND RESUBMIT CORRECTED PLANS AND REQUIRED |
| | DOCUMENTS. WHEN RESUBMITTING, PLEASE PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL |
| | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE |
| | PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB |
| | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL |
| | INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS |
| | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE |
| | DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL |
| | FOLLOW ONCE ALL PLANS ARE APPROVED. |
| | |
| | 1) SUBMIT AC COOLING AND HEATING CALCULATIONS- SECTION |
| | C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING, |
| | VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL |
| | BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA |
| | STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED |
| | EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN |
| | PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING |
| | LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS |
| | THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE |
| | UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE |
| | ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN |
| | APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN |
| | LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM |
| | SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING |
| | IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS |
| | OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL |
| | BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL |
| | PERMIT. |
| | |
| | 2) SUBMIT AN ENERGY COMPLIANCE REPORT - SECTION C401.2 |
| | FBC EC. COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF |
| | THE FOLLOWING: |
| | 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1, |
| | EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD. |
| | 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN |
| | ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH |
| | SECTION C406 AND TENANT SPACES SHALL COMPLY WITH |
| | SECTION C406.1.1. |
| | 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404, |
| | C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING |
| | ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT |
| | OF THE STANDARD REFERENCE DESIGN BUILDING. |
| | PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA |
| | BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER |
| | SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO |
| | APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER |
| | SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE. |
| | |
| | 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER |
| | HEATING SYSTEMS IS REQUIRED PER SECTION 508.2 FBC EC. |
| | PLEASE SUBMIT A COMMISSIONING PLAN PER SECTION |
| | C408.2.1: |
| | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED |
| | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL |
| | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE |
| | FOLLOWING ITEMS: |
| | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| | THE ACTIVITIES. |
| | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| | BE PERFORMED. |
| | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED |
| | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. |
| | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN |
| | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| | 5. MEASURABLE CRITERIA FOR PERFORMANCE' |
| | REFER TO SECTIONS C408.2.4, C408.2.5, AND C408.2.5.4 |
| | FOR PRELIMINARY AND FINAL REPORT REQUIREMENTS AND |
| | SUBMITTALS. PLEASE NOTE THAT A FINAL REPORT SHALL BE |
| | SUBMITTED TO THE BUILDING?S OWNERSHIP AND A COPY OF |
| | THAT REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL |
| | FOR FINAL MECHANICAL INSPECTION APPROVAL AND CO OF THE |
| | BUILDING. |
| | |
| | 4) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. |
| | PLEASE REVIEW THE FOLLOWING LIST AND PROVIDE A LIST ON |
| | THE PLANS OR UPLOAD THE LIST IN DOCUMENT FORM. |
| | |
| | REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP |
| | DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME |
| | OF INSPECTION. |
| | A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS. |
| | B) MOTORIZED AND BAROMETRIC DAMPERS |
| | C) DUCT SMOKE DETECTORS |
| | D) EXHAUST FANS |
| | E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES |
| | INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT |
| | APPROVALS AND/OR MIAMI-DADE NOA'S |
| | F) AC STAND NOA?S OR FL. PRODUCT APPROVALS |
| | G) DUCT FIRE WRAPPING |
| | H) CLOTHES DRYERS INCLUDING THE VENTLESS DRYERS IN THE |
| | SUITES S. |
| | I) COOKING APPLIANCES AND EXHAUST HOODS IN THE COMMON |
| | AREAS AND THE SUITES. (RESTAURANT KITCHEN UNDER |
| | SEPARATE PERMIT, NOT INCLUDED).JI) BATHROOM AND LAUNDRY |
| | EXHAUST TERMINATION CAPS |
| | SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT |
| | FOR REVIEW. |
| | A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR |
| | INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND |
| | APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR |
| | DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE |
| | TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED |
| | ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE |
| | STRUCTURAL ENGINEER RECORD. |
| | B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED |
| | EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING. |
| | C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR |
| | DUCTS AND VENT FLUES. |
| | D) COMMISSIONING REPORTS |
| | |
| | 5) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN |
| | EXHAUST HOODS, FIRE SUPPRESSION SYSTEMS, AND WALK-IN |
| | COOLERS AND FREEZERS. |
| | REGARDING THE KITCHEN EXHAUST, THE FOLLOWING CODE |
| | SECTIONS MAY IMPACT THE HVAC DESIGN FOR THE MAIN |
| | BUILDING. |
| | A) SECTION 508.1.2 FBC M AIR BALANCE: DESIGN PLANS FOR |
| | A FACILITY WITH A COMMERCIAL KITCHEN VENTILATION SYSTEM |
| | SHALL INCLUDE A SCHEDULE OR DIAGRAM INDICATING THE |
| | DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR |
| | BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR |
| | FOR THE FACILITY, PLUS THE NET EXFILTRATION IF |
| | APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE |
| | SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET |
| | EXFILTRATION. B) SECTION 508.1.1 MAKEUP AIR |
| | TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN |
| | MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL |
| | NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE |
| | ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO |
| | NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. |
| | C) SECTION 506.3.13: EXHAUST TERMINATION LOCATIONS AND |
| | CLEARANCE REQUIREMENTS ETC. |
| | |
| | 6) M1.00 & A1.04: THE O/A INTAKE FOR AHU-1 & 2 SHALL BE |
| | A MINIMUM 10' FROM THE PROPERTY LINE- SECTION 401.4 (1) |
| | FBC M. THE LOCATION IS NOT IN COMPLIANCE. |
| | |
| | 7) M1.00 & A.900: FIRE DAMPERS SHALL BE INSTALLED IN |
| | THE LOUVERED DOOR OPENINGS AT THE STORAGE, PUMP, FIRE |
| | PUMP, AND BOILER ROOMS- SECTION 607.5.2 FBC M. |
| | |
| | 8) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS |
| | PENETRATING THE FIRE-RATED WALLS AT THE LUGGAGE, FCC, |
| | AND MAIN MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC M. |
| | |
| | 9) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS |
| | PENETRATING THE FIRE-RATED WALLS AT THE CONFERENCE |
| | ROOM- SECTION 607.5.2 FBC M. A) PLEASE INCLUDE THE FR |
| | DIFFUSERS IN THE SCHEDULE ON SHEET M10.00. |
| | |
| | 10) M1.00 & A.900: FIRE DAMPER MISSING FOR THE 20X14 |
| | DUCT PENETRATING THE FIRE-RATED BAR ROOM WALL- SECTION |
| | 607.5.2 FBC M. |
| | |
| | 11) M1.00: CU-1 AND CU-2 ARE OUTDOOR CONDENSING UNITS |
| | WHICH MUST BE INSTALLED IN ACCORDANCE WITH THEIR |
| | LISTING AND LABELING- SECTION 304.1 FBC M. |
| | |
| | 12) M1.00: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | RETURN AIR SYSTEMS OF AHU-1 & 2- SEE SECTION 606.2.1 |
| | FBC M. |
| | |
| | 13) M1.00: PLEASE PROVIDE AN EQUIPMENT SCHEDULE AND |
| | LAYOUT PLAN FOR THE KITCHENETTE- SEE SECTION 917 FBC M |
| | COOKING APPLIANCES. |
| | |
| | 14) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE |
| | KITCHENETTE AT A RATE OF 25 CFMS CONTINUOUS OR 100 CFMS |
| | INTERMITTENT. CLARIFY IF AN EXHAUST HOOD WILL BE |
| | INSTALLED- SEE SECTION 506 FBC M. |
| | |
| | 15) M1.00, BOILER: A) A FULL REVIEW OF THE BOILER AND |
| | ROOM CANNOT BE PERFORMED WITHOUT MORE INFORMATION ABOUT |
| | THE BOILER INCLUDING AN EQUIPMENT SCHEDULE AND TYPE OF |
| | POWER- GAS OR ELECTRIC. PLEASE NOTE THAT GAS FIRED |
| | BOILERS REQUIRE GAS PIPING PLANS, AND COMBUSTION AIR |
| | AND VENTING PLANS AND CALCULATIONS- SECTIONS 304, 402 |
| | AND 503 FBC FG. |
| | |
| | 16) M1.00: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE |
| | AIR HANDLERS- SECTION 307.2.1 FBC M. |
| | |
| | 17) M1.00 & M1.0A- EMERGENCY GENERATOR: |
| | A) THE RADIATOR EXHAUST SHALL DISCHARGE DIRECTLY OR BE |
| | DUCTED TO THE OUTDOORS- SECTION 7.7.4.2 NFPA-110-2016. |
| | B) THE ENGINE EXHAUST PIPE SHALL DISCHARGE OUTSIDE OF |
| | THE STRUCTURE PER SECTIONS 8.2.3.1 NFPA 37-2015, AND |
| | SECTION 501.3 FBC M. |
| | C) EF-3 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3 |
| | FBC M. A) INDICATE HOW THE FAN WAS SIZED- PROVIDE AN |
| | EXHAUST VENTILATION CALCULATION. |
| | D) EF-3 SHALL RUN CONTINUOUSLY AND NOT BE CONTROLLED BY |
| | THE THERMOSTAT- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA 37, |
| | AND SECTION 502.4.2 FBC M. |
| | E) REFER TO SECTION 7.7.1 NFPA 110- 2016 AND VERIFY |
| | THAT THE VENTILATION AIRFLOW IN THE GENERATOR/TANK |
| | (EPS) ROOM IS DESIGNED TO LIMIT THE MAXIMUM AIR |
| | TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR |
| | TEMPERATURE REQUIRED BY THE GENERATOR MANUFACTURER. |
| | CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT EMITTED TO |
| | THE ROOM BY THE ENERGY CONVERTER, EXHAUST PIPES, AND |
| | ALL OTHER HEAT PRODUCING EQUIPMENT- SECTION 7.7.1.1. |
| | DESIGN OF THE HEATING, COOLING, AND VENTILATION SYSTEM |
| | SHALL AMONG OTHER THINGS, INCLUDE PROVISIONS FOR |
| | FACTORS SUCH AS HEAT, COLD, HUMIDITY, LOUVERS, ETC.- |
| | SECTION 7.7.7. |
| | F) THE LOUVERED AIR INTAKE OPENING INTO THE PARKING |
| | GARAGE IS PROHIBITED PER SECTION 7.7.3 NFPA 110 WHICH |
| | REQUIRES VENTILATION AIR TO BE TAKEN FROM THE OUTDOORS. |
| | IN ADDITION PLEASE NOT THAT A FIRE DAMPER WOULD BE |
| | REQUIRED IN THE LOUVERED OPENING, HOWEVER DAMPERS ARE |
| | NOT PERMITTED IN VENTILATION OPENINGS INTO THE ROOM- |
| | SECTION 7.7.2.3 NFPA 110. |
| | G) VERIFY THAT THE GENERATOR IS CLASSIFIED AS A LEVEL 1 |
| | PER SECTION 4.4 NFPA 110, AND PROVIDE THE UL 2200 |
| | CERTIFICATE OF COMPLIANCE- SECTION 915.1 FBC M. |
| | H) PLEASE PROVIDE A CLEARER COPY OF THE FUEL TANK |
| | DIAGRAM AND SPECIFICATIONS- SECTION 107.2.1 WPB. |
| | |
| | 18) M2.00: THE O/A INTAKES FOR AHU-6 & 7, AND THE |
| | LAUNDRY ROOM MAKEUP AIR SHALL BE A MINIMUM 10' FROM THE |
| | PROPERTY LINE- SECTION 401.4 (1) FBC M. THE LOCATIONS |
| | ARE NOT IN COMPLIANCE. |
| | |
| | 19) M2.00: THE EXHAUST OUTLET FOR THE POOL EXHAUST |
| | SYSTEM SHALL BE A MINIMUM 10' FROM THE PROPERTY LINE- |
| | SECTION 501.3.1 (2) FBC M. THE LOCATION IS NOT IN |
| | COMPLIANCE. |
| | |
| | 20) M2.00: VERIFY THE BOTTOM OF SF-1 IS A MINIMUM 8' |
| | ABOVE THE FINISHED GARAGE FLOOR- SECTION 394.6 FBC M. |
| | |
| | 21) M2.00: FIRE DAMPER MISSING AT THE 20X20 DUCT |
| | PENETRATION FROM AHU-6 THROUGH THE FIRE-RATED MECH |
| | RM/GARAGE WALL. |
| | |
| | 22) M2.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | DRYERS - SECTION 504.6.2 |
| | |
| | 23) M2.00: VERIFY THE DRYER EXHAUST FAN WILL RUN |
| | CONTINUOUSLY OR BE INTERLOCKED TO OPERATE WHEN ANY OF |
| | THE TWO UNITS ARE OPERATING. A) VERIFY THE MOTOR FOR |
| | THE FAN IS LOCATED OUTSIDE OF THE AIRSTREAM. |
| | |
| | 24) M2.00: PROVIDE EQUIPMENT SCHEDULES AND SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE BREAKROOM COOKING |
| | APPLIANCE AND RECIRCULATING HOOD- SECTIONS 505, 506, |
| | AND 917.1 FBC M. |
| | |
| | 25) M2.00: FIRE DAMPER SHALL BE INSTALLED IN THE |
| | LOUVERED DOOR OPENINGS AT THE POOL EQUIPMENT ROOM - |
| | SECTION 607.5.2 FBC M. |
| | |
| | 26) M2.00: A VESTIBULE WILL BE REQUIRED FOR THE POOL |
| | EQUIPMENT ROOM IF THE ROOM CONTAINS A FUEL-FIRED POOL |
| | HEATER- SECTION 305.3.2 FBC FG. |
| | |
| | 25) M3.00, M4.00, M6.00, M.700, M9.00, AND M10.00: |
| | INDICATE HOW O/A IS BEING PROVIDED TO THE HOTEL ROOMS |
| | AND PROVIDE CALCULATIONS- SECTION 401.2 FBC M. NOTE #5 |
| | REFERENCES RTU-1 FOR O/A CALCULATIONS FOR THE ROOMS BUT |
| | NO CALCS ARE PROVIDED. |
| | |
| | 26) M9.00: PLEASE INCLUDE THE CORRIDORS IN THE |
| | VENTILATION CALCULATIONS- TABLE 403.3.1.1. FBC M. |
| | |
| | 27) M13.00: NOA #13-1017.09 IS OUTDATED. PLEASE PROVIDE |
| | AN UPDATED COPY. PLEASE NOTE THIS MAY BE A DEFERRED |
| | SUBMITTAL PER COMMENT #4. |
| | |
| | 28) M13.00: CLEARANCES UNDER THE CONDENSING UNITS SHALL |
| | BE IN ACCORDANCE WITH TABLE 1509.6.5 FBC B. PLEASE |
| | PLACE A NOTE ON THE DETAIL. |
| | |
| | 29) PROVIDE A COMPLETE CONDENSATE DISPOSAL PLAN FOR ALL |
| | THE AIR HANDLERS- SECTION 307.2.1 FBC M. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |