| 2019-01-28 09:10:18 | 1) WHAT STANDARD ARE THE GAS SIZING TABLES FROM? THERE |
| | IS NO REFERENCE ON THESE TABLES TO DETERMINE IF THEY |
| | ARE FROM A STANDARD REFERENCED IN THE 2014 FBC. |
| | 2) REMOVE THE ANCHORING DETAIL FOR THE LP TANK FROM THE |
| | SUBMITTAL PACKAGE. THIS GAS SYSTEM IS NATURAL GAS. IN |
| | ADDITION, THE ENGINEER'S SIGNATURE AND SEAL ON THIS |
| | DOCUMENT CANNOT BE PHOTOCOPIED. IT VIOLATES FL. ADMIN. |
| | RULE 61G15-23.001. ALSO, THIS ENGINEER'S SEAL HAS BEEN |
| | NULL AND VOID SINCE 2015. |
| | 3) THE GAS PERMIT APPLICATION STATES "INSTALL TANK AND |
| | LINE" BUT THE GAS DRAWING SHOWS A NATURAL GAS METER. |
| | CLARIFY. |
| | 4) THERE ARE TWO DIFFERENT SIZING TABLES FOR THE PE |
| | PIPE. CLARIFY. |
| | 5) THERE ARE THREE DIFFERENT GAS DRAWINGS THAT HAVE |
| | BEEN SUBITTED FOR THIS PROJECT. REMOVE THE OLD DRAWINGS |
| | AND SUBMIT TWO COPIES OF A GAS RISER THAT CLEARLY SHOWS |
| | THE SCOPE OF WORK TO BE DONE.WPB AMEND TO FBC |
| | SEC.107.2.1. 6TH REQUEST. |
| | 6) THE GAS PLAN NOTES THE SYSTEM AS A 2 PSI SYSTEM BUT |
| | YOU HAVE SUBMITTED A SIZING TABLE FOR PE PIPE FOR A |
| | LESS THAN 2 PSI SYSTEM. CLARIFY. SUBMIT A COPY OF THE 2 |
| | PSI SIZING TABLE BEING USED OR PLACE A NOTE ON THE |
| | PLANS REFERENCING THE SIZING TABLE BEING USED. 6TH |
| | REQUEST. |
| | 4) CLEARLY SHOW THE DISTANCE FROM THE 2 PSI REGULATORS |
| | TO THE APPLIANCE. COMPLY WITH 2014 FBC-FUEL GAS TABLES |
| | 402.4 FOR THE PROPER PIPE SIZE AND BTU LOAD. 4TH |
| | REQUEST. |
| | 5) SHOW THE DISTANCE OF THE GENERATOR FROM THE EXTERIOR |
| | WALL OF THE STRUCTURE ON THE SURVEY. THE GENERATOR |
| | SHALL BE LOCATED IN ACCORDANCE WITH THE MANUFACTURER'S |
| | INSTALLATION MANUAL OR A MINIMUM OF 5 FEET FROM THE |
| | EXTERIOR WALL OF THE STRUCTURE UNLESS THE WALL IS ONE |
| | HOUR FIRE RATED PER NFPA 37 SEC. 4.1.4. 4TH REQUEST. |
| | 6) THE GAS PLANS REFER TO THE 2010 FBC-FUEL GAS. THE |
| | SYSTEM SHALL BE SIZED USING THE 2014 FBC-FUEL GAS CODE. |
| | THE SIZING TABLE THAT HAS BEEN SUBMITTED DOES NOT SHOW |
| | THAT IT IS FROM THE 2014 FBC-FUEL GAS CODE. 4TH |
| | REQUEST. |
| | 7) SUBMIT TWO COPIES OF THE REGULATOR INSTALLATION |
| | SHEETS. FBC SEC. 107.2.1.4TH REQUEST. |
| | 8) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE |
| | FLEXIBLE CONNECTOR TO THE GENERATOR. THE CONNECTOR |
| | SHALL BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE |
| | GENERATOR 2014 FBC-RES. SEC. G2422.1 .4TH REQUEST. |
| | 9) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| | G2413.4 (1 ) THROUGH G2413.4 (21). |
| | 10) SHOW THE PIPE SIZES FOR ALL THE PIPING INCLUDING |
| | THE EXISTING. WPB AMEND, TO FBC SEC. 107.2.1. |
| | |
| | THE GAS PLANS ARE LACKING REQUIRED INFORMATION SO A |
| | COMPRREHENSIVE REVIEW CANNOT BE DONE. |
| | NOTE: DO NOT RESUBMIT THESE PLANS UNLESS ALL PLAN |
| | REVIEW COMMENTS HAVE BEEN ADDRESSED. PLEASE CALL THE |
| | PLAN REVIEWER TO SET UP AN APPOINTMENT TO GO OVER THESE |
| | REVIEW COMMENTS. |
| | |
| | THE NEXT RESUBMITTAL IS SUBJECT TO 4 TIMES THE PLAN |
| | REVIEW FEE PER FL. STATUTE 553.80 (2) (B). |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | |
| | |
| | |