| 2018-01-02 13:39:48 | 1) MIN PLAN REVIEW CRITERIA REQUIRES 2-SETS OF PLAN AND |
| | ALL DOCUMENTS FBC-107.3.5 |
| | |
| | 2) YOUR ISOMETRIC ONLY SHOWS 10? OF GALV PIPING BUT YOU |
| | STATE 2PSI P.E PIPING AS A GAS TABLE. SUBMIT AN |
| | ISOMETRIC DRAWING THAT CLEARLY SHOWS THE LENGTH OF ALL |
| | CUT SECTIONS OF PIPE PER 2014 FBC-FUEL GAS, SECS |
| | . 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. G2413 |
| | |
| | 3) TABLE YOU ARE USING TO SIZE YOU ?? GALV IN NOT THE |
| | CURRENT 2014 5TH ED OF THE FUEL AND GAS CODE CURRENTLY |
| | IN USE AND IS FOR L.P GAS WHEN YOUR SYSTEM IS NATURAL |
| | GAS. SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| | G2412.8, G2413.1, G2413.2, & G2413.3. |
| | |
| | 4) CITY RECORDS SHOW THE EXISTING GAS SYSTEM AS .5LB |
| | BUT YOUR ARE SHOWING 2LB SYSTEM. THE PLANS INDICATE AN |
| | EXISTING GAS METER. THE BTU LOAD OF THE EXISTING GAS |
| | SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE |
| | SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. |
| | IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3. |
| | |
| | 5) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1. |
| | |
| | 6) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2014 FBC-FUEL GAS TABLES 402.4 |
| | FOR THE PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | 7) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. FBC-FUEL GAS SEC.409.4, |
| | FBC-RESIDENTIAL SEC. G 2420.4. I |
| | |
| | 8) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. FBC-FUEL GAS SEC.409.4, |
| | FBC-RESIDENTIAL SEC. G 2420.4. I |
| | |
| | 9) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413. |
| | |
| | 10) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |
| | |