| 2017-12-28 15:23:08 | 12/28/2017 GAS 1ST REVIEW**DENIED**A SUB-GAS PERMIT IS |
| | REQUIRED. |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | A COPY OF THE REQUIRED CHECK LIST HAS BEEN INCLUDED FOR |
| | YOU. |
| | |
| | 1) YOUR ISOMETRIC DRAWING MUST INCLUDE THE ENTIRE |
| | SYSTEM. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS |
| | THE LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 |
| | FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES |
| | SEC. G2413. |
| | |
| | 2) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413 |
| | |
| | 3) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| | APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. FGC |
| | SEC.304.9.3 OR FBCR G2407.9.3 |
| | |
| | 4) CITY RECORD SHOW EXISTING SYSTEM IS .5LB. INDICATE |
| | THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON THE PLAN |
| | PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. SEC. |
| | G2413.2. |
| | |
| | 5) SUBMIT MANUFACTURER?S INSTALLATION MANUAL FOR ALL |
| | NEW GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS |
| | NFPA 54, NFPA 58, AND FBC-2014 FUEL GAS CODE SEC. |
| | 402.2, AND 301.3 OR 2014 FBC-RES. SEC. G2404.3. GAS |
| | APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| | SEC.305.1, FBC-RES. SEC.G2408.1 |
| | |
| | 6) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| | THE ONLY GAS APPLIANCE ON THIS SYSTEM? CITY RECORDS SO |
| | MORE THEN WATER HEATER. IF NOT, SUBMIT A COMPLETE GAS |
| | RISER SHOWING ALL PIPE SIZES, TYPE OF PIPE, THE |
| | DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET, THE BTU |
| | LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM, THE TYPE |
| | OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM. THESE |
| | REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM |
| | |
| | 7) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1 |
| | |
| | 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| | G2412.8, G2413.1, G2413.2, & G2413.3. |
| | |
| | 9) IF 2 PSI SYSTEM SHOW THE LOCATION OF ALL MP |
| | (STEP-DOWN) REGULATORS. A LISTED SHUTOFF VALVE SHALL BE |
| | INSTALLED IMMEDIATELY AHEAD OF EACH MP REGULATOR. |
| | FBC-FUEL GAS SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4. |
| | |
| | 10) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| | SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| | |
| | 11) IF 2L PSI SYSTEM SUBMIT MANUFACTURER?S |
| | SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| | INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE |
| | APPROVED FOR OUTDOOR INSTALLATION. 2014 FGC SEC.410.1. |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |
| | |