| 2018-04-20 08:15:25 | 2ND REVIEW FBC-2017 MECHANICAL |
| | PERMIT #17120813 |
| | 4/20/18 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE AC CALCULATIONS INDICATE A COOLING LOAD OF 180 |
| | MBH FOR THE ROOMS AND SPACES SERVED BY RTU-3, HOWEVER |
| | THE SYSTEM SELECTED HAS A TOTAL COOLING CAPACITY OF |
| | 84.6 MBH- SEE THE RTU-3 SCHEDULE ON M600. |
| | |
| | 2) AS PREVIOUSLY REQUESTED, AND PER THE REFERENCE NOTE |
| | IN THE AC SCHEDULES, PLEASE PROVIDE SYMBOLS ON THE |
| | MECHANICAL PLANS SHOWING THE LOCATIONS OF REQUIRED DUCT |
| | SMOKE DETECTORS. |
| | |
| | 3) IT APPEARS FROM THE PLANS AND THE ARCHITECT'S |
| | RESPONSE NARRATIVE THAT COMPLETE WIND LOAD ENGINEERING |
| | FOR INSTALLATION OF THE ROOFTOP AC SYSTEMS WILL BE |
| | DEFERRED. PLEASE NOTE THAT THE ENGINEERING SHALL BE |
| | SUBMITTED TO THE BUILDING DEPARTMENT FOR REVIEW AND |
| | APPROVAL PRIOR TO INSTALLATION, AND THE ENGINEERING |
| | SHALL BE ONSITE AT TIME OF INSPECTION. PLEASE REVIEW |
| | SECTION 107.3.4.1 WPB AMENDMENTS TO THE FBC-17: |
| | DEFERRED SUBMITTALS. |
| | |
| | 4) SHEET M202: INDICATE THE TYPES AND SIZES OF |
| | CONDENSATE PIPING, AND INDICATE HOW THE PIPING WILL BE |
| | SUPPORTED AND ANCHORED TO THE ROOF SURFACE. PLEASE |
| | PROVIDE A DETAIL THAT SHOWS THE PIPE SUPPORTS AND |
| | REQUIRED SPACING OF THE SUPPORTS. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |